JLG 25AM Service And Maintenance Manual page 32

Table of Contents

Advertisement

SECTION 2 - SERVICE PROCEDURES
Steer Cylinder Attachment Pins and Pin Retainers
Electrical Connections
Instruments, Gauges Switches, Lights, Horn
No Unauthorized Modifications or Additions
General Structural Condition and Welds
Paint and Appearance
Notify JLG of Machine Ownership
Annual Machine Inspection Due
All Relevant Safety Publications Incorporated
All Decals/Placards Installed, Secure, Legible
All Fasteners, Pins, Shields, and Covers
Function Test of All Systems
Stamp Inspection Date on Frame
2-4
Table 2-2. AM Model - Preventive Maintenance & Inspection Schedule
AREA ON MACHINE
GENERAL
INTERVAL
(1)
(3)
PRE-DELIVERY
ANNUAL
(2)
(YEARLY)
OR FREQUENT
INSPECTION
INSPECTION
1,2
1,2
1,2
1,2
3
3
9
9
2
2
5
5
9
9
9
9
9
9
9
9
1,2
1,2
9
9
-
9
31215808

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

30am38am

Table of Contents