Download Print this page

Biddle HR 25 Manual page 14

Hide thumbs Also See for HR 25:

Advertisement

en
2
. . Installation
2.1
Inspection on delivery
2.2
Hanging the unit up
en-14
Warning:
w
Installation activities may only be performed
by technical staff qualified for this purpose.
Warning:
w
Before starting installation: read the safety
instructions.
See also:
1.5
"Safety instructions" on page 12
Check the unit and the packaging to ensure that they have
been delivered in good order. Notify the driver and the
supplier immediately if any shipping damage is detected.
Ensure that all components are present. Notify supplier of
any missing parts immediately.
See also:
1.4
"Components and accessories" on page 11
2.2.1 Determining the location of the unit
Make sure that the structure from which the unit is about
to be suspended can bear at least 4 times the weight of the
unit. The unit's weight is indicated on its type plate.
The distance between the floor and the unit's underside
must be more than 2.7 m.
Make sure that the electronics and the pressure meters on
the unit's long side remain easily accessible.
Keep the underside of the unit accessible on account of
the inspection hatches.

Advertisement

loading

Related Products for Biddle HR 25

This manual is also suitable for:

Hr 35Hr 45