This document describes how to install the SRX 5600 services gateway.
About This Guide .............................................................................................3
Step 1: Prepare the Site ...................................................................................4
Rack-Mounting Requirements ...................................................................4
Required Tools ..........................................................................................5
Step 2: Install the Mounting Hardware ............................................................6
Open-Frame Rack ..............................................................................6
Step 3: Install the Device .................................................................................8
Install the Device Using a Lift ....................................................................8
Install the Device Without a Mechanical Lift ...........................................10
Remove Components .......................................................................11
Lift the Chassis into the Rack ............................................................11
Reinstall Components ......................................................................12
Step 4: Connect External Devices and IOC Cables .........................................12
Connect to a Network for Out-of-Band Management ...............................13
Connect a Management Console .............................................................13
Connect the IOC Cables ..........................................................................13
Step 5: Connect Ground and Power Cables ...................................................14
Connect the Grounding Cable .................................................................14
Connect Power to an AC-Powered Services Gateway ..............................15
Connect Power to a DC-Powered Services Gateway ................................16
Step 6: Perform Initial Software Configuration ..............................................18
Safety Warnings ............................................................................................22
1

Advertisement

Table of Contents
loading

Summary of Contents for Juniper SRX 5600

  • Page 1: Table Of Contents

    SRX 5600 Services Gateway Getting Started Guide August 2008 Part Number: 530-023490-01 Revision 02 This document describes how to install the SRX 5600 services gateway. Contents About This Guide .....................3 Step 1: Prepare the Site ...................4 Rack-Mounting Requirements ..............4 Required Tools ..................5 Step 2: Install the Mounting Hardware ............6...
  • Page 2 SRX 5600 Services Gateway Getting Started Guide Compliance Statements for NEBS ..............24 Compliance Statements for EMC Requirements ..........24 Canada ....................24 European Union ..................24 JUNOS Software Documentation for J-series Services Routers and SRX-series Services Gateways ..................24 Requesting Technical Support ...............26 Revision History ....................27...
  • Page 3: Contents About This Guide

    By installing different combinations of IOCs and SPCs, you can tailor both the number of Gigabit ports and the maximum security processing capacity to suit your network. Table 1 on page 3 describes the minimum system configuration for the SRX 5600. Table 1: Minimum System Configuraton...
  • Page 4: Step 1: Prepare The Site

    SRX 5600 Services Gateway Getting Started Guide Step 1: Prepare the Site Figure 1: Rack Clearance and Chassis Dimensions Rack-Mounting Requirements You can install the device in a four-post rack or cabinet or an open-frame rack. The rack rails must be spaced widely enough to accommodate the device chassis's external dimensions: 14.0 in.
  • Page 5: Required Tools

    Step 1: Prepare the Site The device must be installed into a rack that is secured to the building structure. The device should be mounted at the bottom of the rack if it is the only unit in the rack. When mounting the device in a partially filled rack, load the rack from the bottom to the top with the heaviest component at the bottom of the rack.
  • Page 6: Step 2: Install The Mounting Hardware

    SRX 5600 Services Gateway Getting Started Guide Step 2: Install the Mounting Hardware To install the mounting hardware in a four-post rack or cabinet or an open-frame rack: Install the Mounting Hardware in a Four-Post Rack or Cabinet or an Open-Frame...
  • Page 7 Step 2: Install the Mounting Hardware Figure 2: Mounting Hardware for a Four-Post Rack or Cabinet Step 2: Install the Mounting Hardware...
  • Page 8: Step 3: Install The Device

    Ensure the rack is in its permanent location and is secured to the building. Ensure that the installation site allows adequate clearance for both airflow and maintenance. For details, see the SRX 5600 Services Gateway Hardware Guide. Load the device onto the lift, making sure it rests securely on the lift platform (see Figure 4 on page 9).
  • Page 9 Step 3: Install the Device Figure 4: Load the Device onto the Lift Using the lift, position the device in front of the rack or cabinet, centering it in front of the mounting shelf. Lift the chassis approximately 0.75 in. above the surface of the mounting shelf and position it as close as possible to the shelf.
  • Page 10: Install The Device Without A Mechanical Lift

    SRX 5600 Services Gateway Getting Started Guide Install the Device Without a Mechanical Lift To install the device without a mechanical lift: Remove Components on page 11 Lift the Chassis into the Rack on page 11 Reinstall Components on page 12...
  • Page 11: Remove Components

    Do not stack removed components. Lay each one on a flat surface. NOTE: For complete instructions on removing device components, see Install the Services Gateway Without a Mechanical Lift” in the SRX 5600 Services Gateway Hardware Guide. Lift the Chassis into the Rack Lifting the chassis and mounting it in a rack requires three people.
  • Page 12: Reinstall Components

    Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and connect the strap to one of the ESD points on the chassis. For more information about ESD, see the SRX 5600 Services Gateway Hardware Guide. Slide each component into the chassis evenly so that it does not become stuck or damaged.
  • Page 13: Connect To A Network For Out-Of-Band Management

    Connect the IOC Cables Have ready a length of the type of cable used by the IOC. For cable specifications, see the SRX 5600 Services Gateway Hardware Guide. If the IOC cable connector port is covered by a rubber safety plug, remove the plug.
  • Page 14: Step 5: Connect Ground And Power Cables

    Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and connect the strap to one of the ESD points on the chassis. For more information about ESD, see the SRX 5600 Services Gateway Hardware Guide. Place the grounding cable lug over the grounding point. The grounding point is sized for UNC 1/4-20 nuts.
  • Page 15: Connect Power To An Ac-Powered Services Gateway

    ESD, see the SRX 5600 Services Gateway Hardware Guide. Locate the power cords shipped with the device, which should have a plug appropriate for your geographical location. See the SRX 5600 Services Gateway Hardware Guide. For each power supply:...
  • Page 16: Connect Power To A Dc-Powered Services Gateway

    SRX 5600 Services Gateway Getting Started Guide Figure 9: Connecting AC Power to the Services Gateway Switch the AC switch on each power supply to the position ( ) and observe the status LEDs on each power supply faceplate. If an AC power supply is correctly...
  • Page 17 Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and connect the strap to one of the ESD points on the chassis. For more information about ESD, see the SRX 5600 Services Gateway Hardware Guide. For each power supply:...
  • Page 18: Step 6: Perform Initial Software Configuration

    SRX 5600 Services Gateway Getting Started Guide Secure the power cable lugs to the terminal studs on the power supply, first with the split washer, then with the nut. Apply between 23 lb-in. (2.6 Nm) and 25 lb-in. (2.8 Nm) of torque.
  • Page 19 Step 6: Perform Initial Software Configuration Retype new password: password Configure an administrator account on the device. [edit] root@# set system login user admin class super-user authentication plain-text-password Configure the password for the administrator account. [edit] root@# set system root-authentication plain-text-password Commit the configuration to activate it on the device.
  • Page 20 SRX 5600 Services Gateway Getting Started Guide Check the configuration for validity. [edit] admin@# commit check configuration check succeeds Commit the configuration to activate it on the device. [edit] admin@# commit commit complete Optionally, display the configuration to verify that it is correct.
  • Page 21 Step 6: Perform Initial Software Configuration interfaces { ge-0/0/0 { unit 0; ge-6/2/0 { unit 0 { family inet { address 5.1.1.1/24; ge-6/3/5 { unit 0 { family inet { address 192.1.1.1/24; fxp0 { unit 0 { family inet { address 192.168.10.2/24;...
  • Page 22: Safety Warnings

    WARNING: See installation instructions before connecting the device. This is a summary of safety warnings. For a complete list of warnings for this device, including translations, see the SRX 5600 Services Gateway Hardware Guide at http://www.juniper.net/techpubs/hardware/ WARNING: The intrabuilding port(s) of the device is suitable for connection to intrabuilding or unexposed wiring or cabling only.
  • Page 23 Safety Warnings Only trained and qualified personnel should install or replace the device. Perform only the procedures described in this guide or the SRX 5600 Services Gateway Hardware Guide. Other services should be performed by authorized service personnel only. Read the installation instructions before you connect the device to a power source.
  • Page 24 SRX 5600 Services Gateway Getting Started Guide Compliance Statements for NEBS The equipment is suitable for installation as part of the Common Bonding Network (CBN). The equipment is suitable for installation in locations where the National Electrical Code (NEC) applies.
  • Page 25 JUNOS Software Documentation for J-series Services Routers and SRX-series Services Gateways Table 4: JUNOS Software Documentation for J-series Services Routers and SRX-series Services Gateways (continued) Book Description JUNOS Software Administration Guide Shows how to monitor J-series and SRX-series devices and routing operations, firewall and security services, system alarms and events, and network performance.
  • Page 26 7 days a week, 365 days a year. Self-Help Online Tools and Resources For quick and easy problem resolution, Juniper Networks has designed an online self-service portal called the Customer Support Center (CSC) that provides you with the following features: Find CSC offerings: http://www.juniper.net/customers/support/...
  • Page 27 Products made or sold by Juniper Networks or components thereof might be covered by one or more of the following patents that are owned by or licensed to Juniper Networks: U.S. Patent Nos. 5,473,599, 5,905,725, 5,909,440, 6,192,051, 6,333,650, 6,359,479, 6,406,312, 6,429,706, 6,459,579, 6,493,347, 6,538,518, 6,538,899, 6,552,918, 6,567,902, 6,578,186, and 6,590,785.

Table of Contents