7
Rack Mounting
If you did not order the Slide Rack, your T/Mon is equipped with rack ears that can be positioned for
either 5" projection or flush mounting in either 23" or 19" racks. To mount the T/Mon directly to the
equipment rack, follow these steps:
1. Determine which mounting configuration is required. The T/Mon is supplied with the brackets in the
19" flush and 5" projection positions.
2. If a different configuration is required, remove the 8-32 screws, re-orient the brackets and re-install
the screws.
3. Place the T/Mon in the rack and align the mounting holes in the brackets with the holes in the rack
rails. Secure each bracket with two 12-24 screws (provided in hardware bag).
Secure T/Mon to Slide Rack
Need help?
Do you have a question about the T/Mon LNX and is the answer not in the manual?
Questions and answers