The installation system is designed for loads of up to 2.4 kN/m² (2,400 Pa). The modules are clamped on
the short frame side or, alternatively, on the long frame side in the corners (clamp surface 11 x 52 mm).
This requires approval from the module manufacturer for clamping on the short frame side or on the corner
of the long frame side. Any drainage openings on the module frame may not be blocked. This also applies
to the features provided for this purpose on the support components.

4 System components, tools and equipment

4.1 Required for installation

Figure
Tool
Component*
Base trough 150-30
Material: Aluminium
Base trough connector set 150-30 I
Material: Aluminium
Tool: Socket bit AF 8 mm
Base trough expansion joint 150-30
Material: Aluminium and V2A
Tool: Socket bit AF 8 mm
Base foot set
Material: Aluminium
Module support set 13°
Material: Aluminium
Flat roof mid clamp
Material: Aluminium and V2A
Tool: Socket bit AF 8 mm
Flat roof end clamp
Material: Aluminium and V2A
Tool: Socket bit AF 8 mm
Flat roof end clamp (short side)
Material: Aluminium and V2A
Tool: Socket bit AF 8 mm
Wind deflector 13° 1.85 m
Material: Aluminium
Tool: Socket bit AF 8 mm
4
Product group
Profile rail
Rail connectors and
expansion joint
Rail connectors and
expansion joint
Module elevation
Module elevation
Module elevation
Module elevation
Module elevation
Module elevation