Fuel Gas Piping Replacement Procedure

6. Installation

Installation procedure is the reverse of the removal procedure.
Caution
Make sure that the O-ring does not fall off or get damaged when tightening the hexagon socket head bolt.
Hexagon socket head bolt C tightening torque

7. Preparation for operation

(1) Turn on the power supply circuit breaker for the
outdoor unit.
(2) Open the main gas valve, starting the fuel supply.
(3) Set the STOP SW (SW001) from STOP to NORM.
(Figure 3)

8. Final check

(1) Running condition check
 Make sure that no abnormal noise or vibration occurs.
 Make sure there are no gas leaks.
 Make sure that none of the attached parts are loose.
(2) Cleanliness check of the surroundings
 Make sure no unneeded items or trash is scattered around.
 Make sure no tools, etc. have been forgotten within the unit.
 Use rags to wipe up any water or oil that has accumulated in the bottom of the unit.
2 N·m
41
Figure.3