Panasonic 2WAY MULTI U-16GE3E5 Main Parts Replacement page 3

Gas heat pump air conditioner
Hide thumbs Also See for 2WAY MULTI U-16GE3E5:
Table of Contents

Advertisement

1.
Required parts and tools used .......................................................................... 23
2.
Preparation for work ........................................................................................... 23
3.
Remove starter .................................................................................................... 23
4.
Install starter ........................................................................................................ 23
5.
Preparation for operation ................................................................................... 23
6.
Final check ........................................................................................................... 23
1.
Required parts and tools used .......................................................................... 24
2.
Preparation for work ........................................................................................... 24
3.
Ignition coils (with built-in power transistors) ................................................. 24
4.
Crank angle sensor (Figure 2) ............................................................................ 24
5.
Cam angle sensor ............................................................................................... 25
6.
Spark plugs .......................................................................................................... 25
7.
Preparation for operation ................................................................................... 26
8.
Final check ........................................................................................................... 26
1.
Preparation for work ........................................................................................... 27
2.
Distributor mode setting .................................................................................... 27
3.
Start test operation and set engine rotational speed ...................................... 28
4.
Ignition timing check .......................................................................................... 29
5.
Correction for distorted amount ........................................................................ 30
6.
Cancel settings .................................................................................................... 33
7.
Stop test run ........................................................................................................ 34
8.
Final check ........................................................................................................... 34
1.
Required parts and tools used .......................................................................... 35
2.
Preparation for work ........................................................................................... 35
3.
Remove compressor drive belt. ......................................................................... 35
4.
Remove the crank pulley .................................................................................... 35
5.
Remove front cover oil seal (Figure 2)............................................................... 35
6.
Install the front cover oil seal (Figure 3)............................................................ 36
7.
Install the crank pulley. ....................................................................................... 36
8.
Install the compressor drive belt. ...................................................................... 36
9.
Preparation for operation ................................................................................... 36
10. Final check ............................................................................................................37
1.
Required parts and tools used .......................................................................... 38
2.
Preparation for work ........................................................................................... 38
3.
Remove the flywheel ........................................................................................... 38
4.
Remove the oil seal ............................................................................................. 38
5.
Oil seal installation .............................................................................................. 39
6.
Preparation for operation ................................................................................... 39
7.
Final check ........................................................................................................... 39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents