Komfovent VERSO Standard Installation Manual

Komfovent VERSO Standard Installation Manual

Hide thumbs Also See for VERSO Standard:

Advertisement

VERSO
Standard
INSTALLATION
EN
MANUAL

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VERSO Standard and is the answer not in the manual?

Questions and answers

Summary of Contents for Komfovent VERSO Standard

  • Page 1 VERSO Standard INSTALLATION MANUAL...
  • Page 2: Table Of Contents

    CONTENT 1. INTRODUCTION ...........................................3 1.1. Safety Requirements ......................................3 1.2. Unit Types and Sizes ......................................3 1.2.1. Unit types by heat recovery type ................................4 1.2.2. Unit types by duct connections ................................5 1.2.3. Unit types by inspection sides ................................5 1.3. Unit components ........................................6 1.3.1.
  • Page 3: Introduction

    VERSO STANDARD air handling units are manufactured in different sizes and various air flow ranges (from 1000 to 7000 m /h).
  • Page 4: Unit Types By Heat Recovery Type

    1.2.1. Unit types by heat recovery type All VERSO Standard air handling units are divided into 3 groups according to the type of recuperator (heat exchanger) used: VERSO R - air handling units with rotary heat exchangers. Rotating wheel (rotor) of a rotary heat exchanger collects heat or cold from the indoor air and transfers it to the fresh supply air.
  • Page 5: Unit Types By Duct Connections

    Right inspection side Left inspection side Air duct to the premises Air duct to the premises Fig. 3. Classification of units by inspection side Depends on your order. UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 6: Unit Components

    Left inspection side L1 7 12 VERSO R 2500 H Right Inspection side R1 Left inspection side L1 Right Inspection side R2 Left inspection side L2 UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 7 Left inspection side L1 Right inspection side R2 Left inspection side L2 VERSO R 7000 H Right inspection side R1 Left inspection side L1 12 11 10 UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 8 5* – water heater / cooler / DX 11 – C5 controller main board 6 – outdoor air lter 12 – Lead-in wire – exhaust air * Depending on the order. UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 9: Vertical Units

    Right inspection side R1 Left inspection side L1 7 12 VERSO R 1700 UV - 2000 UV Right inspection side R1 Left inspection side L1 11 4 UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 10 VERSO R 3000 UV - 4000 UV Right inspection side R1 Left inspection side L1 11 4 VERSO R 5000 V HW/HCW/DX Left inspection side L1 Right inspection side R1 UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 11 Left inspection side L1 Right inspection side R1 VERSO CF 1000 UV - 1300 UV - 1700 UV Right inspection side R1 Left inspection side L1 UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 12 VERSO CF 2300 UV Right inspection side R1 Left inspection side L1 VERSO CF 3500 UV Right inspection side R1 Left inspection side L1 12 9 UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 13 5* – water heater / cooler / DX 11 – C5 controller main board 6 – outdoor air lter 12 – Lead-in wire – exhaust air * Depending on the order. UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 14: Flat Units

    11 12 3 VERSO R 2000 F Right inspection side R2/L1 v L2/R1 VERSO R 3000 F Right inspection side R2/L1 Left inspection side L2/R1 12 11 UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 15 5* – water heater / cooler / DX 11 – C5 controller main board 6 – outdoor air lter 12 – Lead-in wire – exhaust air * Depending on the order. UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 16: Unit Transportation

    After delivery of the air handling unit, carefully inspect its packaging for damage. If mechanical or other damage is visible (e.g., wet cardboard packaging), notify the carrier immediately. If the damage is significant, do not accept the unit. Inform the selling company or the representative of UAB KOMFOVENT within three business days about any damage detected dur- ing delivery.
  • Page 17: Mechanical Installation

    3.1. Requirements for Mounting Location and Installation Base VERSO Standard air handling units are designed for ventilation of medium or large commercial or industrial premises (e.g., stores, offices, hotels, etc.) where standard air temperature and humidity is maintained. These units are not intended for transporting solid particles within air flows.
  • Page 18 VERSO CF flat units with counterflow heat exchanger must be hung with a slope 15–20 mm on the drainage side to facilitate the discharge of condensate from the unit. UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 19 49,5 13,5 43,5 Verso CF 1500 F 1133 16,5 49,5 13,5 43,5 VERSO S 1300 F Verso CF 2500 F 2034 52,5 VERSO S 1300 F UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 20: Inspection Area

    2300 U/H/V 2000 U/H/V 3500 U/H/V 1150 2500 H 1000 5000 V 1450 3000 U/H/V 1150 4000 U/H/V 5000 V 1405 5000 H 1300 7000 H 1500 UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 21: Connection Of Sections

    C – with a mounting frame that should be ordered separately Connect connecting cables and wires of the sections (see Chapter “Electrical Installation”) before fastening sections of an air handling unit. UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 22 1 – edge of the first section to be tightened, 2 – edge of the second section to be tightened, 3 – screw M8, 4 – washer, 5 – threaded bushing, 6 – adhesive gasket, 7 – gasket on a shelf separating different air flows, 8 – external tightening elements UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 23: Duct System Installation

    Different air flow duct positions are marked on the sticker located on the AHU: outdoor intake air air supplied to the premises air extracted from the premises outdoor exhaust air UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 24 700 x 200 700 x 200 700 x 200 700 x 200 3000 F Rectangular 600 x 400 600 x 400 600 x 400 600 x 400 UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 25: Installation Of External Heating/Cooling Devices

    In order to additionally protect the water heater from freezing, you may also use a capillary ther- mostat (see section “Electrical installation”) that should be mounted on the surface of the heater. It is recommended to use PPU made by Komfovent. UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 26: Connection Of A Condensate Drain

    Condensate collection location must be easily accessible for cleaning and disinfection. Fig. 15. Condensate drain connection to sewer system UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 27: Outdoor Units

    3.7. Outdoor Units VERSO STANDARD air handling units are not suitable to install in outdoor areas without additional modification. Units intended be installed outdoor, should be fixed to the base frame and air dampers must be installed on to the duct connections.
  • Page 28: Technical Information

    3~400 15 / 22,5 3000 F 1~230 3~400 2 x 180 Parameters of hot water 60–40 °C. Water duct air heater (DH). It should be ordered. UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 29: Unit Dimensions

    2060/2000 2300 UH/H Left L1 2060/2000 Right R1 1150 2500 1150 3500 UH/H Left L1 1150 2500 1150 (L1,L2) – when the device from the sections UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 30: Vertical Units

    2315 Right R1 1400 1391/1340 (500, 1315, 500) 5000 V 2315 Left L1 1400 1391/1340 (500, 1315, 500) (L1,L2) – when the device from the sections UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 31: Flat Units

    5.4. Units VERSO S Dimensions, mm Unit Length, Height, B/B1 L/L1 H/H1 VERSO S 1300 F 925/893 2100 F 1000 953/893 3000 F 1015 1227/1160 507,5 357,5 UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 32: Electrical Installation

    Fig. 17. C5 controller main board 1 – control panel connection, 2 – Intranet or Internet connection, 3 – inner connections of components, 4 – terminals for external components UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 33 B5 (9–10) – when a water heater is installed, this terminal is used for connecting a return water temperature sensor (NTC 10kΩ) which protects against freezing. UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 34 For the most accurate temperature measurement, sensor in a duct must be installed after all heating/cooling devices at least two duct diameters away from the nearest coil. >2D Fig. 21. Installation of a supply air temperature sensor UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 35 (top or side of the air handling unit). Grommets are fastened to ensure tightness. If the DX device was not predefined in the controller software, these outputs will be inactive. UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 36: Control Panel Installation

    (follow the installation instructions provided with the control panel). Cable to the C5 control board must be connected to a dedicated slot (RJ9 connector; see Fig. 17) UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 37: Connection Of Cables And Wires Between Sections

    (fans, valves, rotor wheel). If necessary, use special ties to attach the wires to the unit housing. UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 38: Connecting The Unit To The Internal Computer Network Or The Internet

    Internet. In case of a computer, the unit is controlled via a web browser, and in case of a smart phone - via the Komfovent app. Use CAT5 type cable to connect your AHU to the computer network (RJ45 connection;...
  • Page 39 IP address. Depending on whether you will use your computer or smart phone with the Komfovent app to control your AHU, you will also need to enter a corresponding port number to the router.
  • Page 40: Filters

    After the filter becomes dirty and the differential pressure value is reached, a message will be displayed on the control panel or computer screen. Fig. 28. Pressure switch Depends on the order. UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 41 (see Annex 1 “Filter replacement” of VERSO STANDARD user manual). After inserting the bag filters, don’t forget to push the clamping mechanism properly to press the filters tightly to the designated gaskets.
  • Page 42 55% (F7) x2 450 x 480 x 96 – – Class ePM1 55% (F7) is available on request. Class ePM1 60% (F7) is available on request. UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 43: Commissioning And Inspection Of The Unit

    If the unit is connected to the mains, the control panel will display a home screen or a screen saver that you can switch off with a single tap. UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 44 To change the ventilation mode settings: select a desired mode and set a desired air volume or temperature with the arrows. To turn of the AHU and return to a home screen: UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 45: Starting The Unit With A Computer

    If you login attempt is successful, “Overview” window is opened. AHU control On/Off Operation mode Active functions Alarm status No alarms If the password was changed, use the changed password. UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 46 2. Select a desired ventilation mode from the list. 3. Enter desired air flow and temperature in the selected mode settings. 4. Press “Save” button at the bottom of the screen. UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 47: Quick Inspection

    CF heat exchanger calibration performed (only in CF units) Other comments: Installer Company Tel. No. Date Signature UAB KOMFOVENT we reserve the right to make changes without prior notice VERSO STANDARD_21-02...
  • Page 48 LITHUANIA PARTNERS UAB KOMFOVENT J. PICHLER Gesellschaft m. b. H. www.pichlerluft.at TECHNINĖS PRIEŽIŪROS SKYRIUS / Ventilair group www.ventilairgroup.com SERVICE AND SUPPORT ACB Airconditioning www.acbairco.be Phone: +370 5 200 8000 Email: service@komfovent.com REKUVENT s.r.o. www.rekuvent.cz www.komfovent.com WESCO AG www.wesco.ch SUDCLIMATAIR SA www.sudclimatair.ch...

Table of Contents