Operation

Entering the required soft water hardness

This request is omitted if an HVE car-
tridge is used.

Selecting conductance monitoring

This request is shown only if using an
HVE cartridge.
You can activate or deactivate (display:
"OFF") conductance monitoring.

Cartridge replacement

The entry is required in order to confirm
that the cartridge or granulate has been
replaced. In the case of a new installa-
tion, this item is confirmed with "No".
Press the following buttons:
to select "Yes" or "No".
If you have selected "Yes":
OK
for 3s to confirm/save.
The display shows "RESET
OK"
18
(cont.)
Press the following buttons:
to select the required value (in
°dH).
OK
to confirm
If conductance monitoring is active,
press the following buttons:
to select the required limit
value between 10 and 200 (in
μS/cm).
OK
to confirm
Note
After completing all the settings, the re-
calculated residual quantity is shown in
litres on the display
Note
Every time the cartridge is replaced, the
settings for "Raw water hardness",
"Cartridge" and "Soft water hardness"
(for HVE) need to be repeated.