Responsibilities Of The Customer Engineer; Reference Material For Maintenance; Before Installation, Maintenance; Power - Ricoh SR4080 Field Service Manual

Finisher
Table of Contents

Advertisement

Responsibilities of the Customer Engineer

Reference Material for Maintenance

• Maintenance shall be done using the special tools and procedures prescribed for maintenance of
the machine described in the reference materials (service manuals, technical bulletins, operating
instructions, and safety guidelines for customer engineers).
• In regard to other safety issues not described in this document, all customer engineers shall strictly
obey procedures and recommendations described the "CE Safety Guide".
• Use only consumable supplies and replacement parts designed for use of the machine.

Before Installation, Maintenance

Power

• Always disconnect the power plug before doing any maintenance procedure. After switching off
the machine, power is still supplied to the main machine and other devices. To prevent electrical
shock, switch the machine off, wait for a few seconds, then unplug the machine from the power
source.
• Before you do any checks or adjustments after turning the machine off, work carefully to avoid
injury. After removing covers or opening the machine to do checks or adjustments, never touch
electrical components or moving parts (gears, timing belts, etc.).
• After turning the machine on with any cover removed, keep your hands away from electrical
components and moving parts. Never touch the cover of the fusing unit, gears, timing belts, etc.
3

Advertisement

Table of Contents
loading

Table of Contents