Maersk Container Industry Star Cool SCI-20 Operating And Service Manual page 34

Refrigeration unit
Hide thumbs Also See for Star Cool SCI-20:
Table of Contents

Advertisement

1. One alarm for PTI or function test failure. Status are also listed in the menu items T04 –
T12(FT)/T19(PTI).
2. One or more alarms for a specific error during the test. Only listed in alarm list.
Failures found during the tests are listed in the alarm list and the results of the separate PTI test
steps are in menu items T04 to T19. Alarms found are logged in the datalog.
A description of an alarm can be found in this manual "14. Detailed alarm description" p. 63.
When the PTI test completes or is aborted, all alarms found during the test are set inactive in the
alarm list. If the alarm list is empty, the unit is completely OK. If the controller is switched off, only
the main status of a PTI test is remembered in menu item T04.
T00 Preview warnings
Function:
See "11.16 Alarms" p. 48.
Value:
-
T01 PTI test
Function:
Start Pre Trip Inspection test run to verify full functionality of the unit and performance test at
different setpoint temperatures.
Value:
For starting PTI test, select either FULL, SHORT or CA via
the test. The PTI test is automatically terminated in case of no errors. Finally, temperature set-
point will be set to the same value as before test initiation.
T02 Test run status
Function:
Go to test run sub menu.
Value:
None.
X01 Last Full PTI
Function:
Date of last full PTI.
Value:
YYYY-MM-DD or N/A.
X02 Last Short PTI
Function:
Date of last short PTI.
Value:
YYYY-MM-DD or N/A.
X03 Last CA PTI
Function:
Date of last CA PTI.
Value:
YYYY-MM-DD or N/A.
X04 Last FT
Function:
Date of last FT.
Value:
YYYY-MM-DD or N/A.
X05 ITI On cycle
Function:
Display remaining on time of current test interval.
Value:
Shown as hours.
or
and press
which initiates
33 of 116 pages

Advertisement

Table of Contents
loading

Related Products for Maersk Container Industry Star Cool SCI-20

Table of Contents