Delivery and handling
Transport and storage
ERS S10 should be transported and stored in the dry.
Supplied components
Rail for wall
mounting
Compatible products
• S1155
• VVM S320
• S1255
• VVM S325
Removing the covers
FRONT COVER
Lift the front cover upwards slightly.
1.
Pull the hatch towards yourself.
2.
NIBE ERS S10-400
Removing parts of the
insulation
FRONT INSULATION
The insulation in the front must be removed to access
the internal parts.
Remove the air filter.
1.
• SMO S40
2.
Slacken off the screws that hold the insulation in
place.
Chapter 2 | Delivery and handling
S
7