Rff2500 Troubleshooting; Self-Contained Air-Cooled; Rotation Sensor Operation - Manitowoc RFF Technician's Handbook

Table of Contents

Advertisement

RFF2500 Troubleshooting

SELF-CONTAINED AIR-COOLED

Normal Operation
When the toggle switch is placed in the ON position the
following controls must be in the closed position before
the ice machine will start:
A.
Bin Thermostat
B.
High Pressure Cut-out Switch
C.
Ice Chute Safety Switch
D.
Low Pressure Switch
E.
Low Water Level Switch
Placing the toggle switch in the ON position starts the
gear motor. After 8 minutes of correct rotation the time
delay ends and the compressor starts. The ice machine will
continue to make ice until ice contacts the bin thermostat.
The ice machine remains off until ice no longer contacts
the bin thermostat.

ROTATION SENSOR OPERATION

Light
Yellow Blinking
Yellow Solid
Red Blinking
Red Solid
See "Rotation Sensor" on page 85 for sequence of operation
66
Definition
Time Delay Period
Normal Operation Sensing
Fault Time Delay Period
Lockout - 8 Consecutive Faults
Remove/Restore Power To Reset
Part Number 000015433_03 5/20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

UffRnfUnf

Table of Contents