!
!
2)After installing the mud pipe, hydraulic oil pipe and electrical harness, the pipe is
hoisted into the originating well and connected;
!
3)Correct the direction of operation , and advance the propulsion pipe in sequence At the
same time;
!
Before performing the corrective operation, the operation of the main jacking
12