GreenMax
®
WARNINGS
• READ AND FOLLOW ALL SAFETY INSTRUCTIONS
• TO AVOID FIRE, SHOCK, OR DEATH; TURN OFF POWER AT CIRCUIT BREAKER OR FUSE AND TURN
OFF POWER AT THE 24 HOUR NIGHT LIGHT/EMERGENCY CIRCUIT AND TEST THAT POWER IN BOTH
CIRCUITS IS OFF BEFORE WIRING, SERVICING, OR REMOVING FIXTURE. THIS FIXTURE IS POWERED
BY TWO (2) CIRCUITS: THE REGULAR POWER BRANCH CIRCUIT AND THE 24 HOUR NIGHT LIGHT/
EMERGENCY CIRCUIT.
• "EMERGENCY CIRCUITS" enclosed label should be placed in a highly visible location if any DRC Smart Pack
• Do not mount near gas or electric heaters.
• The use of accessory equipment is not recommended by the manufacturer may cause an unsafe condition.
Product Description
The DRC Controller and Smart Pack combines all the functionality of a DRC Controller and Load
controlling Smart Pack in a single device. As with any DRC Controller, this device is responsible
for management of all the architectural controls and energy management business logic within a
• The LumaCAN™ network can span multiple rooms and connect multiple DRC devices
together; however it is important to pay particular attention to setup and control of rooms to
avoid cross room control.
• Each DRC Controller can connect to a variety of devices, such as DRC smart packs, relay
Installation
WARNING: TO AVOID FIRE, SHOCK, OR DEATH; TURN OFF POWER at circuit breaker
or fuse and test that power is off before wiring!
NOTE: This is an ESD Sensitive Device. Use safe ESD handling procedures
when installing.
1.
Mount.
a.
using the provided screws.
NOTE the following:
• Ensure that conduit/cable entry clamp is located in
• Dress wires to provide enough clearance when
device is installed.
•
used for Class 2 and the other for Class 1.
• Some jurisdictions, like Chicago, may require the smart pack to be installed into a
enclosure or request the appropriate enclosure from Leviton.
b.
Preferred installation method is 1a above, but the product may also be mounted using
2.
as class 2, sleeve wires with suitable insulating material from the Smart Pack throughout until
Lighting Load
Normal
Panel
BL/WH
Hot
BLK
Neutral
WH
WH/BL
LumaCAN
3.
Connect LumaCAN (See port locations in Operation step 1)
LumaCAN network. Plug in CAT6 cable with standard RJ45 connector. If two connections are
required, remove the terminator from one of the RJ45's and make both connections. If only
one connection is required, leave the supplied terminator connected.
• The sequence of network nodes, as described in the construction documents, may be critical
to ensure power distribution between nodes.
of the system.
• The last device in each LumaCAN run must be terminated using an RJ45 terminator plug.
Additional terminators are available upon request. LumaCAN connections must be wired as
Class 2 and as such should be installed according to the requirements of your authorities
having jurisdiction. If it is required that the Class 2 wiring be in conduit, use a 4 in. square
Smart Pack will power up in the ON state and then default to the last powered down state.
The default from the factory is ON after power up.
DRC™ Controller and Smart Pack
INSTALLATION AND QUICK START SHEET
enabled cell phone or tablet.
®
Mounting Screws
NOTE: ensure all indicators remain visible
To Normal
Green
Normal
Lighting
Smart
Pack
LumaCAN
WARNINGS
• Equipment should be mounted in locations and at heights where it will not be subjected to tampering by
unauthorized personnel.
• To be installed and/or used in accordance with appropriate electrical codes and regulations.
• If you are unsure about any part of these instructions, consult an electrician.
CAUTIONS
• Do not use this equipment for other than intended use.
SAVE THESE INSTRUCTIONS
Cat. No.
Input Voltage/Frequency
Input Power
Standby
20A Tungsten
20A General Purpose Plug Load
Load Ratings
20A Standard Ballast
16A Electronic Ballast, LED
1/2Hp (9.8 FLA) @ 120VAC
Motor Ratings
2 Hp (12 FLA) @ 240-277VAC
0-10V Control
0.8 - 10+VDC, 100mA Sinking
LumaCAN Data
Termination required at end of line, termination jumper provided
LumaCAN Power
Connections
RJ45, CAT6A or better (LumaCAN)
LED Indicator
Yes
Dimensions
Weight
0.6 lb (9 oz)
Mounting
LumaCAN Connections
CAT6 cable
Operational Temperature
IP Rating
Indicator lights and switches (for normal operation)
1
Wi-Fi Switch Actions
Action
Press/Release <1 second
(also can be done with power cycle)
10 second press
20 second press
to factory default state
>25 second press
LED goes dark
2
LuminaRF/Intellect/Zigbee Switch Actions
Action
Feature
Press/Release <1 second
Status indication
10 second press
Enable/disable
20 second press
Reset device to factory default state
>25 second press
LED goes dark
3
4
Wi-Fi Indicator
LuminaRF/Intellect/Zigbee Indicator
Indicator
Feature
Indicator
Solid GREEN
Solid GREEN
6
Heartbeat Indicator
Light
Indicator
Feature
Status
Failed application or
processor failure
solid
Red
Duplicate LumaCAN address
blinking
Processor in reset or startup
White
solid
failure
Off
Failure
off
SPECIFICATIONS
347VAC, 60Hz
12W @ 347V
2.3W @ 347V
12A Electronic Ballast, LED
N/A
1 2 3 4 5 6
Feature
Result
SSID broadcast times out after 15 minutes
Result
formed
5
LumaCAN Indicator
Feature
Indicator
Solid GREEN
Disabled
Possible Causes/Resolution
Cycle power. If a power cycle does not restore proper operation, remove
LumaCAN cables and cycle power again. Do not reconnect LumaCAN
until after normal operation is restored.
Log into controller with app and change LumaCAN address to a unique
address.
Cycle power. If a power cycle does not restore proper operation, remove
LumaCAN cables and cycle power again. Do not reconnect LumaCAN
until after normal operation is restored.
Remove LumaCAN cables. If device starts up, then there is either an
overcurrent or short on the LumaCAN cables. Resolve the problem and
reconnect. If removing cables does not solve the problem, check control
Power Input.
ENGLISH
Feature
LumaCAN enabled
LumaCAN disabled
Need help?
Do you have a question about the GreenMax DRC DRC07-ED0 and is the answer not in the manual?