Additional Pe Introduction For Earthing - Fronius Tauro 50-3 Operating Instructions Manual

Grid-connected inverter
Table of Contents

Advertisement

Additional PE
An optional hole can be made on the right side of the housing at the bottom for an addi-
introduction for
tional PE introduction.
earthing
Danger from faulty or incorrect holes.
This may lead to injuries to the eyes and hands as a result of flying debris and sharp
edges, as well as damage to the inverter.
1
2
CAUTION!
When drilling, wear suitable protective goggles.
Only use a step drill when drilling.
Ensure that nothing is damaged inside the device (for example connection block).
Adapt the diameter of the hole to match the corresponding connection.
Deburr the holes using a suitable tool.
Remove the drilling residues from the inverter.
Insert the screw connection in the hole
and secure to the torque specified by the
manufacturer.
The opening must be sealed in accord-
ance with the protection class of the
inverter!
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tauro eco 50-3Tauro eco 99-3Tauro eco 100-3

Table of Contents