Operation; First Startup; Preparatory Work; Filling Machine With Solvent - BÖWE P 12 Instruction Manual

Dry cleaner
Hide thumbs Also See for P 12:
Table of Contents

Advertisement

6 Operation

6.1 First Startup

The BÖWE Customer Service department is responsible for carrying out the first startup.
Attention: Before opening the switch panel or removing paneling, set the
main switch to " 0".
6.1.1

Preparatory Work

Set up the supply systems (electrical current, cooling water, compressed air, steam and condensate
lines).
6.1.2

Filling Machine With Solvent

(Gas displacement procedure is mandatory)
Use only stabilized, high-purity TETRACHLORETHENE (perc), in accordance with DIN 53978.
The amount of solvent needed is:
P 12:
for the 3-tank model*
P 15:
for the 3-tank model*
* Optional equipment
Tank 1 minimum filling volume P12: 60 l or 16 US gal
Tank 3 minimum filling volume P12: 60 l or 16 US gal
21
approx. 220 l (approx. 360 kg) or approx. 58 US gal (approx. 794 lb)
approx. 280 l (approx. 455 kg) or approx. 74 US gal (approx. 1003 lb)
approx. 260 l (approx. 420 kg) or approx. 69 US gal (approx. 926 lb)
approx. 330 l (approx. 535 kg) or approx. 87 US gal (approx 1180 lb)
P15: 70 l or 18 US gal
P15: 70 l or 18 US gal
6.1
703867-04-A
6
P12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P 15

Table of Contents