ALARM SETPOINTS MUST BE VERIFIED WITH INSTRUMENTS OF KNOWN ACCURACY
N. Low Pressure Hold .........................................................................
O. Low Pressure Unload......................................................................
P. Evaporator Water Freeze..................................................................
Q. High Pressure Cut-Out....................................................................
R. Unit Type =
S. Number of Compressors =
T. Number of Stages =
U. Number of Fan Stages =
V. Software Version =
A. Are all control lines secure to prevent excess vibration and wear?
B. Are all gauges shut off, valve caps, and packings tight after startup?
C. Has the chiller been leak tested? Detail refrigerant leaks and repairs below
Refrigerant Leaks:
Repairs Made
Items not installed per IOM Manual and/or recommended corrective actions
Performed By:
Company Name:
Address:
City/State/Zip Code:
Modem Number:
Signature:
Contractor's Signature
RETURN COMPLETED FORM TO: DAIKIN, WARRANTY DEPT ., PO BOX 2510, STAUNTON, VA
24402
SF-20001 AGZ/AMZ Start-Up 8/2020
IOM 1207-6 • TRAILBLAZER
MODEL AGZ CHILLERS
®
Warranty Registration Form (Scroll)
GENERAL
..............................................
..........................................
...................................
Title:
Telephone:
Date:
5 of 8
142
psig (kPa)
psig (kPa)
psig (kPa)
psig (kPa)
YES
www.DaikinApplied.com
www.DaikinApplied.com
NO