Cable Requirements; Parallel Routing Of Power Cables; Terminal Sizes For Auxiliary And Control Connections - ABB ACS580MV Hardware Manual

Synchronized bypass unit
Hide thumbs Also See for ACS580MV:
Table of Contents

Advertisement

38 Electrical installation

Cable requirements

For information on the requirements for power cables and the ground cable see the
ACS580MV Engineering Guideline
For information on the requirements for the auxiliary power cable and the control cables,
see table below.

Parallel routing of power cables

Cables between drive and motor can be laid in parallel. The number of cables laid in
parallel is limited by the number of entry holes of the entry plate.
For information on the supply voltages, see Rating label of the bypass - drive system.

Terminal sizes for auxiliary and control connections

SBU
Customer I/O terminal
Terminal
wire cross-section (mm
Solid wire
X107:1
X107:2
X108:1
X108:2
X109:1
X109:2
X110:5
X110:6
X110:9
X110:10
X111:1
X111:2
X111:3
X111:4
X111:5
X111:6
X111:7
X111:8
X111:9
X111:10
.
2
)
Flexible wire
2
0.75...4 mm
2
1.5...4 mm

Advertisement