Wiring Work - Samsung DVM Installation Manual

Fcu application kit mim-f00n installation
Hide thumbs Also See for DVM:
Table of Contents

Advertisement

Wiring work

Connecting a power cable and communication cable
Make sure to cut-off the power before connecting the power cable.
The power cable and communication cable of FCU KIT should be within 10% of the
maximum allowable length of the cable or voltage drop.
Install circuit breaker (ELCB) concerning total power consumption of connected FCU KIT.
Connect F3, F4 of FCU KIT terminal block to communication terminal block (F3, F4) of
wired remote controller. (Refer to page 19.)
Use appropriate tools to connect the cables firmly within rated torque range so that it
can withstand external forces, and arrange the cables neatly so that cover or any other
parts won't get loose. If the cable is connected loosely, overheat, electric shock or fire
may occur.
Install the power and communication cable in a protection tube to protect them from
water or external shock.
Connect power cable to ELCB.
Tightening part
Interface module, wired remote
controller connection
AC FAN, 2/3 WAY VALVE
connection
2P TERMINAL BLOCK for power
supply
Tightening torque
N·m
M3
0.5 ~ 0.75
M3.5
0.8 ~ 1.2
M4
1.2 ~ 1.8
lbf·ft
0.37 ~ 0.55
0.59 ~ 0.89
0.89 ~ 1.33
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents