Mitsubishi Electric QAHV-N560YA-HPB Service Handbook page 98

Hot water heat pump
Hide thumbs Also See for QAHV-N560YA-HPB:
Table of Contents

Advertisement

[ VII Control ]
4Check the following.
Check the checkbox.
All places with flow rate valve opening 1000 through 100 are 2 L/min or above?
If 2 L/min or below, air may not be bled out. Perform an air bleeding operation and water flow rate
adjustment operation again.
When there are multiple units, the values of the same pump output opening and the same valve opening
are not greater or less than those for other units by 10% and 2 L/min or more.
(In multiple-unit system, perform a water flow rate adjustment operation at the same time.)
All the values (item codes d01 through d09) are not "0" when the pump output opening is 16%. (Not
whole air is bled out.)
(Note 1) Change SW2-9 and SW2-3 as a stopgap procedure as shown in the table below, and then turn the power
on.
W
h
e
n
t s
r a
u t
p
W
h
e
n
t s
r a
u t
p
(Note 2) The table below shows the water flow rate adjustment operation status in 4 figures when the PCB DIP
switch is set as shown in Note 3.
Water flow rate adjustment operation status
(Note 3) PCB DIP switch settings
S
W
2
-10
-5
ON
OFF
HWE1517A
Multiple unit change-over switch
o
p
r e
t a
o i
n
h
a
s
n
t o
c
o
m
p
e l
e t
d
o
p
r e
t a
o i
n
h
a
s
c
o
m
p
e l
e t
d
N
t o
c
o
m
p
e l
e t
d
C
o
m
p
e l
e t
d
n I
o
p
r e
t a
o i
n
S
W
3
-6
-7
-8
OFF
OFF
ON
Local/internal change-over switch
SW2-9
O
F
F
-
Display
- -
n
g
-
- -
g
i -
n
g
-9
-10
ON
OFF
- 91 -
SW2-3
O
N
-
GB

Advertisement

Table of Contents
loading

Table of Contents