Installing The Gateway - ETC Net3 Setup Manual

Two port gateway
Hide thumbs Also See for Net3:
Table of Contents

Advertisement

Section 2: Installing the Gateway
W A R N I N G :
With power disconnected from the Gateway, you can install or remove the unit from its
enclosure. When using PoE (Power Over Ethernet), don't patch this unit prior to installation.
Make the power and data connections.
2
This may consist of only plugging in the Ethernet
connection if you are using PoE or both power
and Ethernet connections.
J8
+
-
12V PWR
This dc input
supports 8-28Vdc.
ON
S1
3
Set the DMX termination if necessary via S1 and
S2. S1 controls the termination for Port 2, and S2
controls the termination for Port 1.
These switches are defaulted to on for every
module and it is very rare that you would ever
need to disable DMX termination on this unit.
4
RISK OF ELECTRIC SHOCK! Power must be removed from the Gateway
before removing the unit or servicing the unit.
J9
10/100 ETHERNET
1
ON
S2
5
...swing the bottom of the
gateway into place and
tighten the screws on
either side of the bottom of
the unit.
Use the provided screws
to secure the mounting
bracket to the enclosure.
Note that this same
bracket works for in-wall
back boxes,
surface-mount boxes and
portable enclosures.
Line up and insert the top
4
alignment pins first, then...
Near-side
gateway cover
is not shown
for clarity.
Net3 Two Port Gateway Setup Guide

Advertisement

Table of Contents
loading

Table of Contents