7 To secure the module to the chassis, use a flat-blade screwdriver to
tighten the two spring-loaded screws (Figure 3) to Torque Specification 3
to 5 inch-pounds.
To ensure that you tighten screws to Torque Specification, use a torque
screwdriver.
CAUTION: To ensure adequate cooling airflow, install blank faceplates
over all empty slots.
To verify that your EME is operating correctly, watch the LED status display
Verifying EME
Operation
during system power-on. Table 2 shows the sequence of characters that
appears in the LED character display during a successful system
power-on.
Table 2 LED Character Display During Power-on
Characters in Display
random characters
none (blank display)
Diag
Cksm
Stby
Rdy
Enterprise Management Engine Quick Start Guide
Indicate
Power-on has begun
Power-on continues
EME is running self-diagnostic tests
EME is calculating the checksum value
EME is in standby mode, if it is a Secondary
EME is active and ready, if it is a Primary
11
Need help?
Do you have a question about the CoreBuilder 9000 and is the answer not in the manual?
Questions and answers