Turbine To Tower Assembly - Primus Wind Power AIR 40 Owner's Manual

Hide thumbs Also See for AIR 40:
Table of Contents

Advertisement

STEP 4: Attach Turbine to Tower
1.) Insert yaw pad into yaw pivot point/clamp assembly.
2.) NOT SHOWN: Complete turbine wiring connections.
3.) After assembling the yaw clamp, insert yaw/wires into the tower, lift
the yaw clamp assembly 1/8" to secure the yaw onto yaw pad to prevent
metal to metal contact and reduce vibration down-tower. This is espe-
cially important when mounted on boat or structures.
Yaw pivot
& clamp
Tower
tubing
4.) Insert tower into yaw assembly.
5.) Ensure yaw pad is in place.
6.) Apply Tef-Gel w/ applicator provided to yaw bolts prior to assembly.
Tighten screws to secure turbine to tower. It is important that Tef-Gel
is applied to all hardware prior to final assembly.
AIR 40, AIR Breeze, AIR 30, AIR X MARINE and AIR SILENT-X are trademarks of Primus Wind Power 2013 Primus Wind Power Inc.
M5 Socket head screw
5/32"
(comes imbedded in Hex
yaw assembly) wrench
WARNING:
The yaw pad is critical to ensuring proper and secure
turbine mounting to the tower; however, in some instances it
makes it difficult to tell if the tower is properly inserted into the
yaw assembly. Check this carefully before raising the tower.
IMPORTANT: Apply Tef-Gel to yaw bolts prior to assembly.
Observe torque specs during assembly.
IMPORTANT:
Further inspection of the blade bolts, yaw bolts and
rotor nut are recommended and re-tightened within 30 days after
initial installation.
7.) Ensure turbine is securely attached to tower.
8.) Ensure wire connections are secure and double check for initial two
blinks by "powering up" turbine prior to raising the tower. This is especially
important when installed on boats or structures.
AIR Owner's Manual
3-CMLT-2020-A
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Air breezeAir 30Air x marineAir silent-x

Table of Contents