Jackson AJX Series Installation, Operation And Service Manual page 53

Conveyor dishmachines
Hide thumbs Also See for AJX Series:
Table of Contents

Advertisement

PARTS
1
ITEM
QTY
1
5
2
1
3
1
4
2
*Steam models do not use electric heaters.
When replacing a heater, it is HIGHLY recommended that the heater gasket be changed as well. Once
NOTICE
installed, gaskets become compressed and are subjected to extreme temperature changes. Replacing the
gasket when replacing the heater can prevent future leaks.
NOTICE
The nuts used to secure the heater to the tub should be torqued to 16 in-lbs. After tightening, the unit should be
allowed to heat-up and operate normally for approximately 30 minutes. Secure power to the machine and check
the nuts once more to ensure that they are torqued to 16 in-lbs.
07610-003-60-98-L
4
DESCRIPTION
5/16-18 Hex Nut
Heater
Heater Gasket
5/16" Lockwasher
VOLTS
kW
208
18
230
18
208
18
230
18
460
18
2
3
HEATERS
PHASE
PART NUMBER
1
04540-121-79-30
1
04540-121-79-31
3
04540-121-79-30
3
04540-121-79-31
3
04540-121-79-32
HEATER BOX
PART NUMBER
05310-275-01-00
See table below.
05330-200-02-70
05311-275-01-00
45

Advertisement

Table of Contents
loading

Table of Contents