INSTALLATION

INSPECTION

Do not throw away
the packaging if
damage is evident!

UNPACKING

LEVELING

FACILITY HOT
WATER HEATER
07610-003-60-98-L
Before installing the machine, check the packaging and machine for damage. Damaged
packaging indicates possible damage to the product. If there is any type of damage to both
the packaging and machine, DO NOT THROW AWAY THE PACKAGING. The machine
has been inspected at the factory and is expected to arrive in new, undamaged condition.
However, rough handling by carriers or others might result in damage to the machine while
in transit. If this occurs, DO NOT RETURN THE MACHINE TO THE MANUFACTURER.
Instead, contact the carrier and ask them to send a representative to the site to inspect the
damage and complete an inspection report. You must contact the carrier and the dealer that
sold you the machine within 48 hours of receiving the machine.
The machine should be unpacked and removed from the pallet before installing.
Remove the wooden lift beams and their associated brackets after the machine has
been positioned. Open the front door and remove all materials from inside. Once
unpacked, verify there are no missing parts. If a part is missing, contact the manufacturer
immediately.
The machine is designed to operate while level. This is important to prevent any damage
to the machine during operation and to ensure the best results. The machine comes
equipped with adjustable bullet feet, which can be turned using a pair of pliers. Verify
the machine is level from front-to-back and side-to-side before making any electrical or
plumbing connections.
The manufacturer does NOT endorse "Tankless On-demand" water heaters for use with
their machines. The manufacturer DOES endorse, and highly recommends, the standard
"Tank" style water heaters, sized to properly handle the water heating requirements of the
facility.