Deliming - Jackson AJX Series Installation, Operation And Service Manual

Conveyor dishmachines
Hide thumbs Also See for AJX Series:
Table of Contents

Advertisement

OPERATION
1
3
1
3
1
3
1
3
1
3
4
6
4
6
4
6
4
6
4
6
7
9
7
9
7
9
7
9
7
9
A
B
A
B
A
B
A

DELIMING

B
A
B
160
160
150
170
150
170
140
180
140
180
130
130
190
190
120
120
200
200
110
110
210
210
100
100
220
220
!
CAUTION
07610-003-60-98-L
1. Disconnect/turn off chemical feeder equipment.
2. Turn the machine on.
3. Add deliming solution according to chemical supplier's instructions.
4. Close door.
5. Flip AUTOMATIC/DELIME switch to DELIME.
6. Run the machine period of time recommended by chemical supplier.
7. Wait five minutes, then inspect inside of the machine. If the machine is not delimed,
run again.
8. Flip AUTOMATIC/DELIME switch to AUTOMATIC.
9. Run an empty rack through the machine twice.
10. Drain and re-fill the machine.
11. Reconnect/turn on chemical feeder equipment.
CAUTION! This equipment is not recommended for use with deionized water or other
aggressive fluids. Use of deionized water or other aggressive fluids will result in corrosion
and failure of materials and components. Use of deionized water or other aggressive fluids
will void the manufacturer's warranty.
OPERATING INSTRUCTIONS
L1
L2
L3
GRND
1
32

Advertisement

Table of Contents
loading

Table of Contents