Closing Down; Maintenance - M&C SP2500-H Series Instruction Manual

Gas sample probe
Table of Contents

Advertisement

14

CLOSING DOWN

Prior to closing down, i.e. switching off the heating, the probe should be flushed with inter gas or air in
order to prevent the condensation of aggressive components from the process gas.
15

MAINTENANCE

Prior to carrying out maintenance and repairs, the system and process-specific safety measures must
be observed.
Warning
Warning
Warning
Maintenance intervals cannot be recommended. These must be determined depending on the specific
application.
Maintenance of the probe is limited mainly to replacement of the filter mats and inspection of the seals
and gaskets.
Note
22
Beware of aggressive condensate.
Wear safety goggles and appropriate protective clothing!
Caution: Do not touch the probe surface when in use.
The high surface temperatures that prevail are liable to cause burns.
Protective gloves must be worn, and the probe must be protected to
prevent unauthorised access!
Prior to carrying out maintenance on electrical components, the power
supply must be disconnected in all poles. This applies similarly to any
connected alarm and control circuits!
The probe can remain mounted for maintenance or repairs.
Replacement of the process-sided sample tube can take place with the probe
head mounted.
SP2500-H | 1.00.02
www.mc-techgroup.com

Advertisement

Table of Contents
loading

Table of Contents