Connection Of Sample Line - M&C SP2500-H Series Instruction Manual

Gas sample probe
Table of Contents

Advertisement

Check that the filter element is screwed tight and then screw on the mounting adapter  again.
Screw the preliminary filter  or sample tube with appropriate seal into the ¾" thread of the mounting
adapter ;
Push the filter housing cover with preliminary filter or sample tube into the filter space  in the probe
head.
Swing clamp B to the right and with handle C bring eye bolt D in position E, so that the clamp
engages in eye bolt D and threaded bolt H; if necessary, push in or pull out the filter housing cover
slightly with the clamping screw A;
Turn handle C into position F and tighten handle A hand-tight by turning clockwise.
12.3

CONNECTION OF SAMPLE LINE

Provided on the probe side for connection of the sample line is a ¼" NPT i thread. This thread can be
used for screwing in appropriate connecting unions for lines with the sizes Ø 6 mm (standard), 8 mm or
10 mm.
The sample line is connected as follows:
Loosen the toggle-type fasteners on the insulating cover and hood and remove.
Screw the appropriate threaded union into the probe head with sealing tape.
Insert the line through the respective opening in the probe base plate and silicone holder.
Connect the line to the union. For Swagelok
- Fully insert the liner with support sleeve into the union.
- Tighten the union nut finger-tight.
- Prior to tightening, mark the union nut in the 6 o'clock position.
- Grip the body with a spanner and tighten the union nut with 11/4 turns; after a full turn, the mark
must be turned further to the 9 o'clock position.
When connecting hose assemblies to stainless steel unions, a supporting sleeve
must always be used.
The connection must be checked for leaks.
Note
Refit the special hood and close with clamps.
18
fittings:
®
SP2500-H | 1.00.02
www.mc-techgroup.com

Advertisement

Table of Contents
loading

Table of Contents