Midea R410A Tropical ClimaCreator Series Rooftop Package 220V 3Ph 60Hz

6. Duct work

All conditioned air ductwork should be insulated to minimize heating and cooling duct losses.
Use a minimum of 2 inches of insulation with a vapor barrier. The outside ductwork must be
weatherproofed between the unit and the building.
When attaching ductwork to a horizontal unit, provide a flexible watertight connection to prevent
noise transmission from the unit to the ducts. The flexible connection must be indoors and made
out of heavy canvas.
Do not draw the canvas taut between the solid ducts.
At least 1m flame resistant layer must be laid at the end of air duct internal surface.

7. Electrical wiring

7.1 Warning
An all-pole disconnection switch having a contact separation of at least 3mm in all poles
should be connected in fixed wiring.
The appliance shall be installed in accordance with national wiring regulations.
An all-pole disconnection device which has at least 3mm separation distance in all pole and
a residual current device (RCD) with the rating of above 10mA shall be incorporated in the
fixed wiring according to the national rule.
The appliance shall be installed in accordance with national wiring regulations.

7.2 Wiring provision

The units are internally wired at the factory according to generally accepted electrical
technology.