Operating And Installation Instructions - Siemens WSx6 Series Operating And Installation Instructions

Ultrasonic heat and heat / cooling meter
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 10
s
en
Operating and
Installation Instructions
Note: In the text below, the term meter refers both to
the heat meter and to the cooling meter and the com-
bined heat and cooling meter, unless otherwise speci-
fied.
1.
General
1.1
Use
The meter is used for heating or cooling consumption meas-
urement in systems with water.
The meter consists of a volume measurement unit, two fixed
temperature sensors and an electronic unit that calculates the
energy consumption based on volume and temperature differ-
ence.
Note: The meter cannot be opened without damaging
the security seal.
1.2
General notes
The meter left the factory in a faultless condition where safety
is concerned. The manufacturer will provide additional tech-
nical support on request. Calibration relevant security seals on
the meter must not be damaged or removed. Otherwise, the
warranty and calibration validity of the meter will no longer
apply.
Keep the packaging so that you can transport the meter in
its original packaging following expiry of the calibration va-
lidity.
Lay all cables at a minimum distance of 500 mm to high
voltage and high frequency cables.
A relative humidity of < 93 % at 25 °C is permissible
(without condensation).
Avoid cavitation in the whole system due to overpressure
i.e. at least 1 bar at qp and approx. 2 bar at qs (applies for
approx. 80 °C).
2.
Safety information
The meters may only be used in building service
engineering plants and only for the applications
described.
The meter is designed in accordance with the guide-
lines of the environment categories M1+E1 and must
be fitted in line with these regulations.
The local regulations (installation etc.) must be ad-
hered to.
The operating conditions according to the type plate
must be complied with during use. Non-compliance
can result in hazardous situations and the expiry of all
claims arising from liability for defects as well as
liability on the basis of any expressly granted guaran-
tees.
The meter is only suitable for circulating water in
heating systems.
The meter is not suitable for drinking water.
Beware of sharp edges on thread, flange and meas-
uring section.
Requirements
for
16911: 2016).
Siemens Building Technologies
Ultrasonic heat and heat / cooling meter WSx6..
circulating
water
(CEN / TR
A6V11285667_----_b
Only personnel, trained in the installation and opera-
tion of meters in heating and cooling systems, may
install and remove the meter.
Only install or remove the meter when the pipes are
pressure-less.
After installing the meter, check the leak-tightness of
the system.
Guarantee and calibration validity will lapse if the
calibration relevant security seal is broken.
Only clean the meter from outside with a soft, lightly
wetted cloth. Do not use any spirit or cleaning sol-
vent.
As far as disposal is concerned, the meter is a waste
electronic appliance in the sense of European Di-
rective and it must not be disposed of as domestic
waste.
-
Dispose of the meter through the channels pro-
vided for this purpose.
-
Respect the local and currently valid legislation.
-
Dispose of used batteries at the collection points
provided for them.
-
You can find additional documents about the
disposal of products at
http://www.siemens.com/bt/download
The meter contains lithium batteries. Do not dispose
of the meter and the batteries with domestic waste.
Observe the local stipulations and laws on disposal.
You can return the lithium batteries to the manufac-
turer for appropriate disposal following use. When
shipping please observe legal regulations, in particu-
lar, those governing the labelling and packaging of
hazardous goods.
Do not open the batteries. Do not bring batteries into
contact with water or expose to temperatures above
80 °C.
The meter does not have any lightning protection.
Ensure lightning protection via the in-house installa-
tion.
3.
Installation
To install the meter proceed as follows:
Determine the place of installation in line with the inscrip-
tion on the meter.
Note: At a heating meter
heat/cold meter the mounting place of the flow sen-
sor cold side is equivalent to return
mounting place of the flow sensor hot side is equiva-
lent to flow
.
Note: At a cooling meter
of the flow sensor hot side is equivalent to the return
. The mounting place of the flow sensor cold
side is equivalent to flow
Observe the dimensions of the meter and check whether
there is sufficient space available.
A6V11285667_----_b
05.06.2018
Translation
WSx6..
or combined
. The
the mounting place
.
05.06.2018
9

Advertisement

Table of Contents
loading

Table of Contents