Chapter 2
iTRAK 5730 System Installation
M4 x 8mm
T20
18
4.0 N
m (35 lb
•
50
18. When all flat rails are in alignment, apply final torque to all screws.
in)
•
Install Bottom Rectangular Rails
1. Place and seat a rubber O-ring in each of the two lubrication system
openings on a curved rectangular-rail section.
Rockwell Automation Publication 2198T-UM003A-EN-P - May 2020
A drop of oil can help to keep the rubber O-ring in place.