Honeywell Gamewell FCI S3 Series Manual page 42

Small addressable fire alarm control panel
Table of Contents

Advertisement

Installation Wiring
2.19.1.1 E3BB-FLUSH-LCD Cabinet A2 Front Cover to Backbox Installation
Figure 2.19.1.1.1 illustrates the E3BB-FLUSH-LCD front cover to the backbox installation.
1.
Mount the keyswitch to the E3BB-FLUSH-LCD Flush Mount Front Cover and secure with one, nut (3/4-
24 THD Hex) as shown in Location 1 in the figure below.
2.
Attach the keyswitch cable to the key as shown in Location 2 in the figure below.
3.
To mount the LCD-SLP keypad to the E3BB-FLUSH-LCD Flush Mount Front Cover, insert eight nuts
(#6-32, Hex Keps) in the eight-hole mounting pattern and secure the nuts from the keypad to the front
cover as shown in Location 3 in the figure below.
4.
Plug-in the P2 keyswitch cable to the W2 terminal on the LCD-SLP display as shown in Location 4 in the
figure below.
5.
Attach the E3BB-FLUSH-LCD Flush Mount Front Cover to the backbox.
6.
Insert eight screws (#6-32 x 3/8" PHBHD, BLK) in the eight-hole mounting pattern and secure the
screws from the front cover to the backbox as shown in Location 5 in the figure below.
.
E 3B B -FLU SH -LC D
FLU S H M O U N T
FR O N T C O V ER
S C R E W ,
(# 6 -3 2 x 3 /8 ")
B H B H D , B L K
(8 P L A C E S )
42
L C D -S L P /
L C D -E 3
5
3
5
3
5
1
5
K E Y S W IT C H
Figure 2.19.1.1.1 E3BB-FLUSH-LCD Cabinet A2 Installation
S3 Series UL Listing Document — P/N LS10005-051GF-E:D3 3/09/2016
E3BB-FLUSH-LCD Cabinet A2 Assembly
B A C K B O X
5
3
3
4
P 2 , K E Y S W IT C H
2
C A B L E (2 IN R T .
A N G L E H E A D E R )
1
K E Y S W IT C H
C A B L E
N U T ,
¾ "-2 4
T H D H E X
5
5
5
N U T , (# 6 -3 2) H E X
K E P S (8 P L A C E S )

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents