Xylem Bell & Gossett e-82 Series Nstruction Manual

Xylem Bell & Gossett e-82 Series Nstruction Manual

Packing seal
Hide thumbs Also See for Bell & Gossett e-82 Series:

Advertisement

Quick Links

INSTRUCTION MANUAL
P2005039
Series e-82 Packing Seal
Instructions

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Bell & Gossett e-82 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Xylem Bell & Gossett e-82 Series

  • Page 1 INSTRUCTION MANUAL P2005039 Series e-82 Packing Seal Instructions...
  • Page 3: Table Of Contents

    Table of Contents Table of Contents 1 Introduction and Safety......................2 1.1 Introduction........................2 1.2 Safety..........................2 2 Product Description......................3 2.1 Operation specifications....................3 3 Operation..........................4 3.1 Note on the packed pump operation................4 4 Maintenance.........................5 4.1 Remove the seal or packing rings................. 5 4.2 Assemble the packed stuffing box.................5 Series e-82 Packing Seal Instructions INSTRUCTION MANUAL...
  • Page 4: Introduction And Safety

    1 Introduction and Safety 1 Introduction and Safety 1.1 Introduction Purpose of this manual The purpose of this manual is to serve as an IOM addendum for operation and installation of packing in e-82 series twin inline pumps. For the e-82 twin inline pump installation, operation, and maintenance use P2004729 Series e-82 Instruction Manual.
  • Page 5: Product Description

    2 Product Description 2 Product Description 2.1 Operation specifications See P2004729, Series e-82 Instruction Manual Section 3.1 for more information. Use packing on open or closed systems which require a large amount of makeup water, as well as systems that are subject to a wide variety of chemical conditions and solids buildups. Parameter Packing Operating temperature range, F°...
  • Page 6: Operation

    3 Operation 3 Operation 3.1 Note on the packed pump operation See P2004729, Series e-82 Instruction Manual Chapter 5 for more information. Tighten the gland nuts Before you start the pump, back off the packing gland nuts or screws until the gland is loose. Hand tighten until the gland is snug against the first packing ring.
  • Page 7: Maintenance

    4 Maintenance 4 Maintenance 4.1 Remove the seal or packing rings This information replaces P2004729, Series e-82 Instruction Manual Section 6.4.5. 1. Remove the hex nuts from the seal cap bolts. 2. For the 80-PF, remove the hex nuts that hold the packing gland to the stuffing box. 3.
  • Page 8 4 Maintenance See the note on the packed pump operation in the Operation chapter for more information. Series e-82 Packing Seal Instructions INSTRUCTION MANUAL...
  • Page 12 The original instruction is in English. All non-English instructions are translations of the original instruction. Tel: (847) 966–3700 Fax: (847) 965–8379 © 2020 Xylem Inc www.xylem.com/bellgossett Bell & Gossett is a trademark of Xylem Inc or one of its subsidiaries. P2005039_en-US_2020-09_Series e-82 Packing Seal Instructions...

Table of Contents