Thermo Scientific Dionex Operator's Manual page 182

Integral process analytical systems
Table of Contents

Advertisement

Dionex Integral Systems Operator's Manual
2. From the top of the AE, thread the tower light cable through the round
opening in the front left corner of the AE (see
3. On the inside of the AE, slide the ring back onto the tower light and
tighten the ring to secure the tower light to the top of the AE (see
Figure
170
Thread tower light
cable through this
opening
Figure C-16. Opening for Tower Light on Top of AE
C-17).
Figure C-17. Tower Light Installed
Figure
C-16).
Doc. 065250-06 03/2020

Advertisement

Table of Contents
loading

Table of Contents