Connect the Cables
1. Plug one end of the male-to-male relay cable into the male connector
on the TTL/Relay controller board on the SP door (see
Figure C-8. TTL/Relay Controller Board Installed on Main SP Electronics Board
2. Route the relay cable to the inside of the AE. For the horizontal SP
enclosure, you can route the cable through the interior of the SP and
out through the horizontal slot on top of the SP.
3. Plug the free end of the relay cable into the male connector insert
inside the AE.
4. Repeat
5. Close and secure the SP service door.
6. If you previously removed the SP from the AE rear panel:
a. Lift up the SP, align the four hooks on the rear of the SP with the
b. Replace any modules that were removed from the lower shelf of
c. Replace the two access panels on the exterior of the AE.
Doc. 065250-06 03/2020
C • TTL and Relay Installation Instructions
Male (TTL)
Connector
Step 1
through
Step 3
mounting rails on the AE rear panel, and hang the SP onto the
rails.
the AE.
Female (Relay)
Connector
for the female cable and connector.
Figure
C-8).