Preparations for Linearity Check
At the reference cell
Slide the sensor card into its holder on one of the reference cell modules. Insert the
detector module into the hole on the reference point box and twist 90° to lock.
Connect the multi-mode fibre and the power cable of the 2-meter hybrid cable to the
sensor card. Connect the single mode fibre to the E2000 connector of the launcher.
Set up at the one of the 5 RC 3009 verification cells.
At the central unit site
For the channel that is to be checked, replace the hybrid cable at the back of the
central unit with the other end of the 2-meter hybrid cable.
Protect the fibre ends from any dust or dirt. The performance of the analyzer may
decrease substantially if the fibre ends become contaminated.
Linearity Check
On the MMI, go to the Diagnostic Values Screen (function number 2) and check the
transmission of the specific channel. Adjust the potentiometer of the detector so that
the Current Transmission becomes approximately 200 units. If there is no
transmission at all, the cable connections should be checked.
Before altering any parameters, note the original settings so that you can
return to these later!
1. Go to the Pressure Correction screen (82). Set the mode to Manual.
Enter the Manual Value 1013 mbar.
2. Go to the Temperature Correction screen (83). Set the mode to Manual. Set the
Manual Value to 23 °C.
3. Go to the Path Length screen (85). Set the path length to 1 meter.
4. Go to the Span Calibration screen (21). Activate calibration mode
Unrestricted © SIEMENS AG 2019. All rights reserved.
Annual functional tests of TÜV/MCERTS approved LDS 6 instruments (Linearity check HCl).
LDS 6 Service Instruction A5E01267558A.
LDS 6 Service Instruction
.
(Code 3: 3714)