Designing, manufacturing and mounting the
installation hardware
Once the physical location of the transducer has been determined, the installation hardware
must be designed, manufactured and mounted.
Prerequisites
Before you can do this task, the following prerequisites must be met:
• All relevant vessel and transducer drawings must be available.
• All relevant work instructions, procedures and standards must be available.
• The physical location of the transducer has been determined.
• The installation method has been determined.
• The cable gland has been installed.
• All relevant personnel (naval architects, designers, skilled shipyard workers) and tools
must be available.
Context
The installation shipyard must provide all necessary installation drawings. If required, all
drawings and documents provided by shipyard for the installation of the transducermust
be approved by the vessel's national registry and corresponding maritime authority and/or
classification society.The shipowner and the shipyard doing the installation are responsible
for obtaining and paying for such approval.
The outline dimensions of the ES120-7C transducer and the relevant installation items
can be found in the Drawing file chapter in this manual. Relevant outline dimensions and
production drawings can be download from our website. The source drawings are available
in AutoCad format.
Procedure
1
Based on the vessel drawings, the physical properties of the hull, and the functionality
required by the ES120-7C, design the mounting hardware.
2
Manufacture the hardware according to the relevant production standards.