Designing, Manufacturing And Mounting The Installation Hardware - Simrad ES38-7 Installation Manual

Split-beam transducer
Hide thumbs Also See for ES38-7:
Table of Contents

Advertisement

Simrad ES38-7 Installation Manual
Designing, manufacturing and mounting the installation hardware, page 24
Installing the cable gland, page 25
Designing, manufacturing and mounting the steel conduit, page 27
Unpacking the transducer from its transport crate, page 29
Installing the transducer cable, page 30
Mounting the transducer, page 33
Painting the transducer face, page 19
Designing, manufacturing and mounting the
installation hardware
Once the physical location of the transducer has been determined, the installation hardware
must be designed, manufactured and mounted.
Prerequisites
Before you can do this task, the following prerequisites must be met:
• All relevant vessel and transducer drawings must be available.
• All relevant work instructions, procedures and standards must be available.
• The physical location of the transducer has been determined.
• The installation method has been determined.
• The cable gland has been installed.
• All relevant personnel (naval architects, designers, skilled shipyard workers) and tools
must be available.
Context
The installation shipyard must provide all necessary installation drawings. If required, all
drawings and documents provided by shipyard for the installation of the transducermust
be approved by the vessel's national registry and corresponding maritime authority and/or
classification society.The shipowner and the shipyard doing the installation are responsible
for obtaining and paying for such approval.
The outline dimensions of the ES38-7 transducer and the relevant installation items can
be found in the Drawing file chapter in this manual. Relevant outline dimensions and
24
404292/D