The TPS65313-Q1 device is a power management integrated circuit (PMIC) for safety-relevant automotive
applications. This device integrates a wide-input voltage off-battery buck regulator (BUCK1), a low-voltage
buck regulator (BUCK2), and a 5-V boost converter (BOOST). The TPS65313-Q1 device integrates
protection features such as independent voltage monitors, overtemperature protection, watchdog function,
and built-in analog and digital diagnostic tests. The features of the device target safety-relevant
applications with system-safety requirements up to ASIL-C level.
This user's guide provides instructions to power up and evaluate the TPS65313-Q1 device using the
TPS65313-EVM evaluation module (EVM) and software user interface (TPS65313 GUI).
1
2
3
4
5
6
7
8
TPS65313-EVM Schematic Diagram
9
TPS65313-EVM Part List
10
PCB Layer Diagram
11
Description of the Watchdog Algorithm Implemented on EVM
1
EVM Top-View Diagram With Basic Connections
2
TPS65313-EVM GUI Installation Sequence
3
TPS65313-EVM GUI LabVIEW RTE Installation Selection
4
TPS65313 GUI Device Controls Page
5
Watchdog Window Timing Diagram
6
Updated Figure 6. TPS65313 GUI Register Map Page TPS65313 GUI Register Map Page
7
TPS65313 GUI EEPROM Programming Page
8
Jumper Settings for EEPROM Update
9
10
BUCK2 Efficiency Plot
11
12
Power Up Showing Regulator Outputs and VREG
13
Power Up Showing Regulator Outputs and WAKE
14
Regulators Start-Up showing NRES with short NRES extension delay
15
16
Warning Warning Hot surface.
Contact may cause burns.
Do not touch!
.........................................................................................
...............................................................................................................
............................................................................................
....................................................................................
.................................................................................................
........................................................................................................
....................................................................................
.......................................................................................
..................................................................................
....................................................................................
= 13 V
IN
.....................................................................................................
....................................................................................................
Copyright © 2018-2020, Texas Instruments Incorporated
SLDU028A - January 2018 - Revised March 2020
TPS65313-EVM User's Guide
Contents
.........................................................
..................................................................
.............................................................
.......................................................
List of Figures
......................................................................
.............................................................................
............................................................
.........................................................................
....................................................................
....................................................................
............................................
.............................................
.................................................................
User's Guide
..........................................
....................
3
3
4
5
6
6
12
18
21
28
34
3
5
5
7
9
10
11
12
12
12
12
13
13
13
13
14
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPS65313-EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TPS65313-EVM

  • Page 1: Table Of Contents

    ASIL-C level. This user's guide provides instructions to power up and evaluate the TPS65313-Q1 device using the TPS65313-EVM evaluation module (EVM) and software user interface (TPS65313 GUI). Warning Warning Hot surface. Contact may cause burns.
  • Page 2 = 3.3 V (Phase Margin >80 Degree, ....................... Bandwidth ≈20 kHz) ..........TPS65313-EVM: TPS65313-Q1 Device External Circuit Schematic ........... TPS65313-EVM: MSP430™ USB2ANY MCU Circuit Schematic ..........TPS65313-EVM: USB2ANY Power and Control Circuit Schematic ......................PCB Top Layer ......................PCB Inner Layer-1 ......................PCB Inner Layer-2 ......................
  • Page 3: Tps65313-Evm Top View With Basic External Connections

    BUCK1 output and therefore no external supply voltage is required for the BUCK2 regulator and BOOST converter. Figure 1. EVM Top-View Diagram With Basic Connections TPS65313-EVM Input, Output Voltages, and Load Current Requirements Table 1 lists the input and output voltage for each regulator and their maximum load-current requirements.
  • Page 4: Tps65313-Evm Jumper Settings

    TPS65313-EVM Jumper Settings www.ti.com TPS65313-EVM Jumper Settings The TPS65313-EVM has many jumpers to make the EVM more flexible. Setting these jumpers correctly for the correct function of the EVM is important. Table 2 lists the jumpers and their functionality. The EVM is preconfigured with default jumper settings and users can power up the regulators without any jumper modifications.
  • Page 5: Tps65313-Evm Gui Installing And Opening The Gui

    TPS65313-EVM GUI Installing and Opening the GUI www.ti.com TPS65313-EVM GUI Installing and Opening the GUI This section provides the step-by-step instructions to install the TPS65313-EVM GUI on a computer. Step 1. Unzip the TPS65313GUI.zip file and double click on the Setup_TPS65313_EVM.exe executable file.
  • Page 6: Tps65313-Evm Power-Up And Power-Down Procedure

    EEPROM Programming page — The TPS65313-Q1 device has many factory programmable device options with unique orderable part numbers. By default, the TPS65313-EVM has a device with the O31310QRWGRQ1 orderable part number. If users want to evaluate different device options (or orderable part numbers), the EEPROM configuration can be updated using this page, which is part of the High Level Configuration page.
  • Page 7 ACTIVE) is updated automatically. The WD Fail Count field shows the current value of the device watchdog (WD) fail counter. SLDU028A – January 2018 – Revised March 2020 TPS65313-EVM User’s Guide Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 8 Read Window Durations — Click this button to read back the values of the WD_WIN1_CFG and WD_WIN2_CFG registers and update the timing values in the Window1 Duration (ms) and Window2 Duration (ms) fields. TPS65313-EVM User’s Guide SLDU028A – January 2018 – Revised March 2020 Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 9 The SPI status flag response byte of the device is displayed in this section of the Device Controls page. For more information, refer to the TPS65313-Q1 Wide-VIN Power-Management IC for Automotive Applications datasheet. SLDU028A – January 2018 – Revised March 2020 TPS65313-EVM User’s Guide Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 10 6. Field view section — This section provides the individual register description. Figure 6. Updated Figure 6. TPS65313 GUI Register Map Page TPS65313 GUI Register Map Page TPS65313-EVM User’s Guide SLDU028A – January 2018 – Revised March 2020 Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 11 The TPS65313-Q1 device has many factory programmable device options with unique orderable part numbers. By default, the TPS65313-EVM has a device with the O31310QRWGRQ1 orderable part number. If users want to evaluate different device options (or orderable part numbers), the EEPROM...
  • Page 12: Tps65313-Evm Typical Plots

    EXTSUP supply connected to the BOOST converter. Figure 9. BUCK1 Efficiency Plot for V = 13 V Figure 10. BUCK2 Efficiency Plot TPS65313-EVM User’s Guide SLDU028A – January 2018 – Revised March 2020 Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 13: Boost Efficiency Plot

    Figure 14. Regulators Start-Up showing NRES with short Figure 15. Regulators Start-Up showing NRES with long NRES extension delay NRES extension delay SLDU028A – January 2018 – Revised March 2020 TPS65313-EVM User’s Guide Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 14: Power Down Showing Regulator Outputs And Vreg

    Figure 19. BUCK1 Ripple Voltage With 3-A Load Current Figure 18. BUCK1 Ripple Voltage With 3-A Load Current for 3.6-V Output Voltage for 3.3-V Output Voltage TPS65313-EVM User’s Guide SLDU028A – January 2018 – Revised March 2020 Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 15 Figure 24. BUCK1 Load Transient With Maximum Load Figure 25. BUCK1 Load Transient With Maximum Load Current for 3.3-V Output Voltage Current for 3.6-V Output Voltage SLDU028A – January 2018 – Revised March 2020 TPS65313-EVM User’s Guide Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 16 Figure 30. BUCK1 Gain and Phase Plot With 1-A Load Current for V = 13 V (Phase Margin ≈50 Degree, Bandwidth > 100 kHz) TPS65313-EVM User’s Guide SLDU028A – January 2018 – Revised March 2020 Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 17 Figure 32. BOOST Gain and Phase Plot With 0.3-A Load Current for V = 3.3 V (Phase Margin >80 Degree, Bandwidth ≈20 kHz) SLDU028A – January 2018 – Revised March 2020 TPS65313-EVM User’s Guide Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 18 GPIO4/SPI(SIMO)/UART(TXD) AGND1 Net-Tie Net-Tie 604k 604k 604k NRES PGND GPIO03(NRES) PGND PGND Figure 33. TPS65313-EVM: TPS65313-Q1 Device External Circuit Schematic TPS65313-EVM User’s Guide SLDU028A – January 2018 – Revised March 2020 Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 19 GPIO03 (NRES) P2.1/TA1.2 P1.1/TA0.0 P2.0/TA1.1 P1.0/TA0CLK/ACLK Reserved (p2.3) TI-MSP430F552X_A-PN80 GPIO7(MCU_ERR) EXT_SENSE2(GPIO14/PWM5) SYNC_IN(GPIO12) GPIO6/PWM1/SPI(CS) Figure 34. TPS65313-EVM: MSP430™ USB2ANY MCU Circuit Schematic SLDU028A – January 2018 – Revised March 2020 TPS65313-EVM User’s Guide Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 20 BC 846PN H6327 100k EXT_SENSE2 EXT_SENSE2(GPIO14/PWM5) BC 846PN H6327 100k 9.1V 220pF Figure 35. TPS65313-EVM: USB2ANY Power and Control Circuit Schematic TPS65313-EVM User’s Guide SLDU028A – January 2018 – Revised March 2020 Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 21 TPS65313-EVM Part List www.ti.com TPS65313-EVM Part List Table 3 lists the bill of materials (BOM) for the TPS65313-EVM. Table 3. Bill of Materials Designator Quantity Value Description Package Reference Part Number Manufacturer Alternate Part Alternate Manufacturer Number !PCB1 Printed Circuit Board...
  • Page 22 V, ± 1%, C0G/NP0, 0603 C70, C71, 1200 CAP, CERM, 1200 pF, 0603 06031C122JAT2A 100 V, ± 5%, X7R, 0603 TPS65313-EVM User’s Guide SLDU028A – January 2018 – Revised March 2020 Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 23 TE Connectivity Mini-USB Type B, R/A, Top Mount SMT Header, 2.54 mm, 2x1, Header, 2.54 mm, 2x1, TSW-102-07-T-S Samtec Tin, TH SLDU028A – January 2018 – Revised March 2020 TPS65313-EVM User’s Guide Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 24 AEC-Q200 Grade 0, 0603 R14, R15 13.0 k RES, 13.0 k, 1%, 0.1 W, 0603 CRCW060313K0FKEA Vishay-Dale AEC-Q200 Grade 0, 0603 TPS65313-EVM User’s Guide SLDU028A – January 2018 – Revised March 2020 Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 25 RES, 0, 5%, 0.05 W, 0201 0201 CRCW02010000Z0ED Vishay-Dale Switch, Tactile, SPST-NO, 4.93x4.19x6.2 mm 7914G-1-000E Bourns 0.1 A, 16 V, SMT SLDU028A – January 2018 – Revised March 2020 TPS65313-EVM User’s Guide Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 26 DBV0006A (SOT-23-6) 500 mA, Adjustable, Low DRB0008A TPS73533DRBT Texas Quiescent Current, Low- Instruments Noise, High-PSRR, Single- Output LDO Regulator, DRB0008A (VSON-8) TPS65313-EVM User’s Guide SLDU028A – January 2018 – Revised March 2020 Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 27 R55, R58, RES, 10, 5%, 0.25 W, 0603 CRCW060310R0JNEAHP Vishay-Dale AEC-Q200 Grade 0, 0603 Switch, Tactile, SPST-NO, Switch, 6.1x1.8x4.6 EVQ-PSD02K Panasonic SLDU028A – January 2018 – Revised March 2020 TPS65313-EVM User’s Guide Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 28 PCB Layer Diagram www.ti.com PCB Layer Diagram Figure 36. PCB Top Layer TPS65313-EVM User’s Guide SLDU028A – January 2018 – Revised March 2020 Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 29: Sldu028A - January 2018 - Revised March 2020 Tps65313-Evm User's Guide

    PCB Layer Diagram www.ti.com Figure 37. PCB Inner Layer-1 SLDU028A – January 2018 – Revised March 2020 TPS65313-EVM User’s Guide Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 30 PCB Layer Diagram www.ti.com Figure 38. PCB Inner Layer-2 TPS65313-EVM User’s Guide SLDU028A – January 2018 – Revised March 2020 Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 31 PCB Layer Diagram www.ti.com Figure 39. PCB Inner Layer-3 SLDU028A – January 2018 – Revised March 2020 TPS65313-EVM User’s Guide Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 32 PCB Layer Diagram www.ti.com Figure 40. PCB Inner Layer-4 TPS65313-EVM User’s Guide SLDU028A – January 2018 – Revised March 2020 Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 33 PCB Layer Diagram www.ti.com Figure 41. PCB Bottom Layer SLDU028A – January 2018 – Revised March 2020 TPS65313-EVM User’s Guide Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 34 = 1 else if wdt_step = 3: WR_WDT_ANSWER = calculate_answer1(question) wdt_step = 4 mcu_answer_cnt = 0 else if wdt_step = 4: TPS65313-EVM User’s Guide SLDU028A – January 2018 – Revised March 2020 Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 35 Description of the Watchdog Algorithm Implemented on EVM www.ti.com WR_WDT_ANSWER = calculate_answer0(question) wdt_step = 0 mcu_answer_cnt = 3 end if end if end loop SLDU028A – January 2018 – Revised March 2020 TPS65313-EVM User’s Guide Submit Documentation Feedback Copyright © 2018–2020, Texas Instruments Incorporated...
  • Page 36 Changed Input Voltage From: 5.8 V to 36 V To: 6 V to 18 V and updated the table note ......• Updated J9, J27, and J28 default jumper settings in the TPS65313-EVM Jumper Settings table • Changed the orderable part number From: 0313B014QRWGRQ1 To: O31310QRWGRQ1 in the GUI figures, Schematic ......................
  • Page 37 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2020, Texas Instruments Incorporated...

Table of Contents