Texas Instruments TPS65219EVM User Manual
Texas Instruments TPS65219EVM User Manual

Texas Instruments TPS65219EVM User Manual

Evaluation module
Table of Contents

Advertisement

Quick Links

www.ti.com
User's Guide
TPS65219 Evaluation Module
This user's guide describes the characteristics, operation, and use of the TPS65219 evaluation module (EVM).
The TPS65219EVM is a fully assembly platform for evaluating the performance and functionality of the
TPS65219 power management IC (PMIC). The EVM includes an onboard USB-to-I
and jumpers for all DC regulator inputs and outputs, as well as test points for common measurements.
1
Caution.....................................................................................................................................................................................3
2
Introduction.............................................................................................................................................................................3
3
Requirements..........................................................................................................................................................................3
3.1
Hardware............................................................................................................................................................................3
3.2 Software.............................................................................................................................................................................
4 TPS65219 Resources Overview............................................................................................................................................
Configuration..................................................................................................................................................................5
Configuration.................................................................................................................................................5
5.2 Configuration Headers.......................................................................................................................................................
Points........................................................................................................................................................................10
6 Graphical User Interface (GUI)............................................................................................................................................
6.1 Getting Started.................................................................................................................................................................
Page.................................................................................................................................................................16
6.3 Register Map Page..........................................................................................................................................................
6.4 NVM Configuration Page.................................................................................................................................................
Configuration...................................................................................................................................................19
6.6 NVM Programming Page.................................................................................................................................................
6.7 Additional Features..........................................................................................................................................................
7 Schematics, PCB Layouts, and Bill of Materials...............................................................................................................
Schematic...............................................................................................................................................22
7.2 TPS65219EVM PCB Layers............................................................................................................................................
7.3 TPS65219EVM Bill of Materials.......................................................................................................................................
8 Revision History...................................................................................................................................................................
Figure 5-1. TPS65219EVM Default Configuration - Output Voltages..........................................................................................
Figure 5-3. TPS6521901 Power-Up Sequence...........................................................................................................................
Figure 6-1. GUI Composer Gallery............................................................................................................................................
Figure 6-2. Locating the PMIC GUI in the Gallery.....................................................................................................................
Figure 6-3. GUI Software Download Options............................................................................................................................
Figure 6-4. GUI Panel Within the Gallery..................................................................................................................................
Figure 6-5. PMIC GUI Desktop Application...............................................................................................................................
Figure 6-6. GUI Home Page......................................................................................................................................................
Page........................................................................................................................................................16
Page..................................................................................................................................................17
Figure 6-10. Save/Load Register Options.................................................................................................................................
Figure 6-11. Sequence Plotting Tool..........................................................................................................................................
Figure 6-12. NVM Programming Page......................................................................................................................................
SLVUCD1A - MAY 2022 - REVISED SEPTEMBER 2024
Submit Document Feedback
ABSTRACT

Table of Contents

List of Figures
Jumpers......................................................................................................6
Sequence.......................................................................................................................8
Jumpers......................................................................................................9
Page.........................................................................................................................................18
Copyright © 2024 Texas Instruments Incorporated
Table of Contents
2
C adapter, power terminals,
TPS65219 Evaluation Module
3
4
8
12
12
17
18
21
21
22
24
27
30
5
7
12
13
13
14
15
16
19
20
21
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPS65219EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TPS65219EVM

  • Page 1: Table Of Contents

    This user's guide describes the characteristics, operation, and use of the TPS65219 evaluation module (EVM). The TPS65219EVM is a fully assembly platform for evaluating the performance and functionality of the TPS65219 power management IC (PMIC). The EVM includes an onboard USB-to-I C adapter, power terminals, and jumpers for all DC regulator inputs and outputs, as well as test points for common measurements.
  • Page 2 Trademarks www.ti.com Figure 7-1. TPS65219EVM, Schematic Page 1........................Figure 7-2. TPS65219EVM, Schematic Page 2........................Figure 7-3. TPS65219EVM Top Layer............................24 Figure 7-4. TPS65219EVM - Signal Layer1..........................Figure 7-5. TPS65219EVM - Signal Layer2..........................Figure 7-6. TPS65219EVM - Signal Layer3..........................Figure 7-7. TPS65219EVM - Signal layer4..........................26...
  • Page 3: Caution

    GUI installation and setup process, please see Section 6 of this guide. Note that the EVM can power up and operate without use of software. SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 TPS65219 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 4: Tps65219 Resources Overview

    5 mm × 5 mm, 0.5 mm pitch VQFN • 5 mm × 5 mm, 0.5 mm pitch VQFN • (Wettable-Flank) TPS65219 Evaluation Module SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 5: Evm Configuration

    This section describes the default configuration programmed on the TPS6521901 PMIC. The TPS65219EVM comes with the TPS6521901 PMIC installed which is one of the orderable part numbers of the TPS65219 device family. The default output voltages for the Bucks and LDOs is shown in Figure 5-1.
  • Page 6: Figure 5-2. Tps65219Evm Default Configuration

    High: LDO1 = 3.3 (requires PVIN_LDO1=3.3V) Low: LDO1 = 1.8V (LDO1 behaves as a x ed 1.8V LDO) £ Figure 5-2. TPS65219EVM Default Configuration - Jumpers Table 5-1. TPS65219EVM Default Jumper Configuration Header Jumper Default Position Supply selection for LDO1...
  • Page 7: Figure 5-3. Tps6521901 Power-Up Sequence

    EVM Configuration Table 5-1. TPS65219EVM Default Jumper Configuration (continued) Header Jumper Default Position High = sets 3.3V output voltage on LDO1 if the LDO is supplied by a VSEL 3.3V source. Low = sets 1.8V output voltage on LDO1 (default EVM config)
  • Page 8: Configuration Headers

    Figure 5-4. TPS6521901 Power-Down Sequence 5.2 Configuration Headers The TPS65219EVM has multiple headers that can be used to change the input supply for some of the power rails. The PCB also includes headers that allows changing specific functions of the PMIC using the multi-function pins.
  • Page 9: Figure 5-5. Tps65219Evm Default Configuration

    High: LDO1 = 3.3 (requires PVIN_LDO1=3.3V) Low: LDO1 = 1.8V (LDO1 behaves as a x ed 1.8V LDO) £ Figure 5-5. TPS65219EVM Default Configuration - Jumpers Table 5-2. TPS65219EVM Default Jumper Configuration Header Jumper Default Position Supply selection for LDO1...
  • Page 10: Test Points

    Low = performs a warm reset (reset target voltage and Bypass mode configs to the default NVM values) 5.3 Test Points The TPS65219EVM EVM contains multiple test points for various measurements. Trace assignments to the test points are shown in the table below. Table 5-3. TPS65219 EVM Test Points...
  • Page 11 Table 5-3. TPS65219 EVM Test Points (continued) Test Point Associated Trace TP38 GPO1 TP39 GPO2 TP40 nINT TP41 nRSTOUT TP42 TP43 USB_5V TP44 TP45 TP46 MCU3V3 SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 TPS65219 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 12: Graphical User Interface (Gui)

    Figure 6-1. GUI Composer Gallery In the gallery, locate the TPS65219_GUI panel shown in Figure 6-2 by using the search bar and entering TPS65219_GUI. TPS65219 Evaluation Module SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 13: Figure 6-2. Locating The Pmic Gui In The Gallery

    The upper three options offer a standalone download for the appropriate operating system, while the lower three are for the GUI Composer Runtime. Figure 6-3. GUI Software Download Options SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 TPS65219 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 14: Launching The Gui

    Figure 6-4, that is not associated with the download or information icons. Figure 6-4. GUI Panel Within the Gallery TPS65219 Evaluation Module SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 15: Figure 6-5. Pmic Gui Desktop Application

    At the bottom of the Home page, users can navigate to the other GUI pages, which are described in the subsequent sections. These pages can also be found on the left side of the GUI interface. SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 TPS65219 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 16: Collateral Page

    At the bottom of the page, there is a link to our E2E forums for technical questions about the GUI or PMIC. Figure 6-7. Collateral Page TPS65219 Evaluation Module SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 17: Register Map Page

    Since each write is comes with an associated read, the Register Map display is updated to reflect that the bits were not changed by the write attempt. SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 TPS65219 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 18: Nvm Configuration Page

    The Mask Settings tab allows users to control fault reporting for PMIC protection features, which includes masking for undervoltage, temperature, and interrupt signals. TPS65219 Evaluation Module SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 19: Sequence Configuration

    The power-up sequence and power-down sequence tabs plot the voltage level of each signal as a function of time based on the corresponding settings. SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 TPS65219 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 20: Figure 6-11. Sequence Plotting Tool

    Reset Axis • Toggle Like Spikes • Show Closest Data on Hover • Compare Data on Hover. Enabled by default. TPS65219 Evaluation Module SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 21: Nvm Programming Page

    In the top right of the log window, users can filter out the different information types, save the list of events, and clear or close the log window. SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 TPS65219 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 22: Schematics, Pcb Layouts, And Bill Of Materials

    PVIN_LDO34 VBUCK2 TPS6521901RHBR Orderable: ChangeMe in variant Designed for: Public Release Mod. Date: 10/12/2022 Figure 7-1. TPS65219EVM, Schematic Page 1 TPS65219 Evaluation Module SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 23: Figure 7-2. Tps65219Evm, Schematic

    External LDO GPO2 GPO1 GPIO TP46 U2 TPS7A2033PDBVR EXTLDO MCU3V3 2.2µF 2.2uF nINT nRSTOUT Figure 7-2. TPS65219EVM, Schematic Page 2 SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 TPS65219 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 24: Tps65219Evm Pcb Layers

    Schematics, PCB Layouts, and Bill of Materials www.ti.com 7.2 TPS65219EVM PCB Layers Figure 7-3. TPS65219EVM Top Layer Figure 7-4. TPS65219EVM - Signal Layer1 TPS65219 Evaluation Module SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 25: Figure 7-5. Tps65219Evm - Signal Layer2

    Schematics, PCB Layouts, and Bill of Materials Figure 7-5. TPS65219EVM - Signal Layer2 Figure 7-6. TPS65219EVM - Signal Layer3 SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 TPS65219 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 26: Figure 7-7. Tps65219Evm - Signal Layer4

    Schematics, PCB Layouts, and Bill of Materials www.ti.com Figure 7-7. TPS65219EVM - Signal layer4 Figure 7-8. TPS65219EVM - Bottom Layer TPS65219 Evaluation Module SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 27: Tps65219Evm Bill Of Materials

    Schematics, PCB Layouts, and Bill of Materials 7.3 TPS65219EVM Bill of Materials Table 7-1. Bill of Materials DESIGNATOR QUANTITY VALUE DESCRIPTION PART NUMBER MANUFACTURER C1, C2, C7, C10 10uF CAP, CERM, 10uF, 10V, +/- 20%, X5R, 0402 CL05A106MP5NUNC Samsung Electro-Mechanics...
  • Page 28 TP1, TP2, TP9, TP11, PCB Pin, Swage Mount, TH 2505-2-00-44-00-00-07-0 Mill-Max TP13, TP15, TP17, TP19, TP22, TP29, TP30, TP31, TP32, TP33, TP41, TP42 TPS65219 Evaluation Module SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 29 Texas Instruments DRY0006A (USON-6) Socket, QFN-32, 0.5mm pitch, TH QFN-32_40_BT-0.5-02-00 Enplas Tech Solutions Crystal, 24.000MHz, 20pF, SMD ECS-240-20-5PX-TR ECS Inc. SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 TPS65219 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 30: Revision History

    Changes from Revision * (May 2022) to Revision A (September 2024) Page • Updated to reflect the new EVM revision throughout the document ..............TPS65219 Evaluation Module SLVUCD1A – MAY 2022 – REVISED SEPTEMBER 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 31 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 32 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 33 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 34 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 35 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2023, Texas Instruments Incorporated...
  • Page 36 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2024, Texas Instruments Incorporated...

This manual is also suitable for:

Tps65219

Table of Contents