Bosch NTI 1000 Original Instructions Manual
Bosch NTI 1000 Original Instructions Manual

Bosch NTI 1000 Original Instructions Manual

Nitrogen tire inflator

Advertisement

Quick Links

NTI 1000
en Original instructions
Nitrogen tire inflator

Advertisement

Table of Contents
loading

Summary of Contents for Bosch NTI 1000

  • Page 1 NTI 1000 en Original instructions Nitrogen tire inflator...
  • Page 3: Table Of Contents

    Removing the transport packaging 4.1.1 Opening the NTI 1000 4.1.2 Opening the nitrogen tank Installation 4.2.1 Preparing to install the NTI 1000 4.2.2 Mounting the vacuum pump (optional) 9 4.2.3 Electrical connections 4.2.4 Pneumatic connections Connecting the external nitrogen tank to the...
  • Page 4: Symbols Used

    Whatever the event, Intermediate An instruction produces a visible inter-  Bosch liability is restricted to the amount for which the result mediate result. customer actually pays for this product. This disclaimer Final result There is a visible final result on com- "...
  • Page 5: Obligation Of Contractor

    In such cases the user may be required to Do not open the NTI 1000 cover or tamper with the take the appropriate action. pneumatic connections.
  • Page 6: Product Description

    Application �.4.� N�� ���� The NTI 1000 can be used for inflating or deflating heavy truck tires with a rim diameter ranging from 18 inches to 26 inches. The highest filling pressure at which the NTI 1000 can be operated is 150 PSI.
  • Page 7: Description Of Function

    Description of function 7 Power socket 8 Digital port for inflation/deflation The NTI 1000 works on the principle of Pressure Swing 9 Direct inlet for inflation Adsorption (PSA). PSA is a regenerative process of gen- 10 Digital port for inflation/deflation erating nitrogen from compressed air.
  • Page 8: Cms And Nitrogen Tanks

    Bosch Limited. �.5.5 Power cable and master switch The NTI 1000 is connected to 230 VAC  10%, 50 Hz 2. Move the packing case containing the installation  1% .supply via a power chord. The NTI 1000 can be site.
  • Page 9: Installation

    Power supply - 230 VAC +/- 10 %, single phase, 50 4.2.� Preparing to install the N�� ���� The NTI 1000 unit has to be installed on a level surface of area 800 mm X 800 mm with concrete flooring. For safe operation, provide a minimum clearance of 1000 mm around the NTI 1000.
  • Page 10: Electrical Connections

    FRC unit of the NTI 1000. However, even if the filter is not installed, the particulate matter and moisture is filtered at the FRC unit of the NTI 1000.
  • Page 11: Connecting The External Nitrogen Tank To The Nti 1000

    3 Inlet of the external tank 1. Push the polyurethane hose from the Inlet port (Fig. 2, Pos. 4) of the NTI 1000 into the inlet of the external tank (Fig. 6, Pos. 3). 2. Connect the other polyurethane hose from the outlet A00_30 (Fig.
  • Page 12: Gas Selection

    (Fig. 2, Pos. 9), the selected gas (air or nitrogen) by- passes the manifold (Fig. 3, Pos. 2). Hence, the pres- sure is not monitored by the pressure sensor. The tire pressure has to be manually checked. F 002 DG9 A00 2013-04-16 Bosch Limited...
  • Page 13 R Disconnect the filling nozzle from the tire and connect it back to tire. Ensure HOSE IMPROPER that the hose is connected to the digital outlet ports of the NTI 1000. R Check if there is leakage at the connector. If there is leakage, the clip should be tightened.
  • Page 14: Program Description �4

    �nitiating nitrogen generation 3. Connect the filling nozzle to the tire. After the NTI 1000 is powered on, nitrogen generation 4. Hold the filling nozzle till the tire gets deflated.  After the set pressure is reached, a long beep is starts automatically.
  • Page 15: Maintenance �5

    Replacement of spare parts 7.2.� Replacing the air filling connector 1. Switch off the master switch of the NTI 1000. 2. Open the front door. Risk of injury due to pressure in the hoses High pressure in the hoses might cause the hoses to fly apart and cause injury.
  • Page 16: Routine Maintenance

    7.� Routine maintenance 7.2.2 Replacing the braided hose for outlet 1. Switch off the master switch of the NTI 1000. 7.�.� Draining the filter regulator of the N�� ���� Risk of injury due to pressure in the hoses Upon opening the drain of the FRC, mist will spur High pressure in the hoses might cause the out.
  • Page 17: Decommissioning �7

    ¶ together with the unit. Proper disposal of the NTI 1000 prevents The NTI 1000 has to be transported in the original or environmental pollution and possible equivalent packaging. health hazards. Heed the notes on initial commissioning.
  • Page 18 Tank pressure gauge 0 to 16 Permissible ambient temperature ranges Maximum ambient temperature °C Operating range °C 5 to 45 Storage temperature °C 0 to 50 Miscellaneous Length of filling hose Protection IP54 F 002 DG9 A00 2013-04-16 Bosch Limited...
  • Page 20 Bosch Limited P.B. No.3000, Hosur Road, Bangalore 560 030 INDIA www.boschindia.com AADG.Service@in.bosch.com F 002 DG9 A00 | 2013-04-16...

Table of Contents