ABB MAG-SM Instruction Bulletin page 3

Field mount housing and 19“-design
Table of Contents

Advertisement

Introductory Safety Notes for the EMF System
Regulated Usage
The Electromagnetic Flowmeter System (EMF), consisting of a flowmeter primary and a converter, is
manufactured in state of the art designs and is safe to operate. The flowmeter is to be installed exclusively
in applications which are in accord with the specifications.
Every usage which exceeds the specifications is considered to be non-specified. Any damages resulting
therefrom are not the responsibility of the manufacturer.
The user assumes all risk for such usage.
The applicable specifications include the installation, start-up and service requirements specified by the
manufacturer.
Installation, Start-Up and Service Personnel
Please read this Instruction Bulletin and the safety notes before attempting installation, start-up or service.
Only qualified personnel should have access to the instrument. The personnel should be familiar with the
warnings and operating requirements contained in this Instruction Bulletin.
Assure that the interconnections are in accordance with the Interconnection Diagrams.
Ground the flowmeter system.
WHen the housing cover is removed, the EMC-Protection is reduced.
Observe the warning notes designated in this document by the symbol:
Hazardous Material Information
In view of the Disposal Law of 27 Aug. 86 (AbfG. 11 Special Wastes) the owner of special wastes is
responsible for its care and the employer also has, according to the Hazardous Material Law of 01 Oct. 86
(GefStoffV, 17 General Protection Responsibility), a responsibility to protect his employees, we must make
note that
a) all flowmeter primaries and/or flowmeter converters which are returned to ABB Automation Products for
repair are to be free of any hazardous materials (acids, bases, solvents, etc.).
b) the flowmeter primaries must be flushed so that the hazardous materials are neutralized. There are
cavities in the primaries between the metering tube and the housing. Therefore after metering
hazardous materials, these cavities are to be neutralized (see Hazardous Material Law -GefStoffV).
For two piece housings the housing screws are to be loosened. For flowmeter primaries ≥ 14"/DN 350
the drain plug at the bottom of the housing is to be removed in order to neutralize any hazardous material
in the magnet coil and electrode areas.
c) for service and repairs written confirmation is required that the measures listed in a) and b) have been
carried out.
d) any costs incurred to remove the hazardous materials during a repair will be billed to the owner of the
equipment.