Structure With Modules On Cc-Link Ie Tsn And Ethernet Devices - Mitsubishi Electric MELSEC iQ-R Series User Manual

Cc-link ie tsn
Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

Structure with modules on CC-Link IE TSN and Ethernet devices

Connection with modules on CC-Link IE TSN and Ethernet devices
■Line topology
The network with modules and devices is configured in a line topology. A general-purpose hub is not required.
Up to eight modules on CC-Link IE TSN can be connected to P1 or P2 of the master station at the position indicated with (1).
Connect Ethernet devices to the end of the network.
No.0
Class B
No.0: Master station
No.1: Local station (1st module)
No.8: Remote station (8th module)
(2) Ethernet device
Class A: Authentication Class A device
Class B: Authentication Class B device
When an error occurs in a slave station, the stations connected after the faulty station will be disconnected.
■Star topology
Modules or devices are connected in a star topology via a switching hub.
• Since cyclic data is sent to an Ethernet device when a local station is used with an Ethernet device on the end side via a
switching hub, communication may not be possible depending on the type of an Ethernet device.
No.0
Class B
General-
purpose hub
No.1
Class A
No.0: Master station
No.1, No.2: Local station
(1) Ethernet device
Class A: Authentication Class A device
Class B: Authentication Class B device
(1)
No.1
Class B
No.2
Class A
(1)
5.2 Structure of Authentication Class B/A Devices and Ethernet Devices
No.8
Class A
(2)
5 SYSTEM CONFIGURATION
5
49

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rj71gn11-t2

Table of Contents