INITIAL SETUP

STEP 1: PREPARE THE JOB SITE

Mounting hardware not included in SmartAire MZ kit. Must be ordered separately.
Please ensure the installment site is clean and free of obstructions.
Unpack unit and all accessories. Prepare zip ties and associated mounting hardware available nearby.
Prepare the DirectAire® or DirectAire® Al Panel and Installation Location.
HANDLE UNIT WITH CARE, DO NOT MANUALLY ADJUST DAMPER BLADES,
SUPPORT OR LIFT UNIT BY DAMPER BLADES.
MANIPULER L'UNITÉ AVEC SOIN, NE PAS AJUSTER LES LAMES DU REGISTRE
MAUNELLEMENT, NE PAS SOUTENIR OU LEVER L'UNITÉ PAR LES LAMES.
7510 Montevideo Road
© 2014 Tate Access Floors, Inc.
Jessup, MD 20794
Tel (410)799-4200
7 of 26

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SmartAire MZ and is the answer not in the manual?

Subscribe to Our Youtube Channel

Related Products for Tate SmartAire MZ

Table of Contents