Step 8: Deploy The Air Blockers - Tate SmartAire MZ User's Installation Manual

Hide thumbs Also See for SmartAire MZ:
Table of Contents

Advertisement

User Installation Manual
®
SmartAire
MZ
r1.9-3/11/15

STEP 8: DEPLOY THE AIR BLOCKERS

Slightly loosen the "air blockers" from the frame and slide them to the fully extended position. Then
Retighten the screws down to lock them in position.
A MANUAL PHILIPS HEAD SCREWDRIVER OR A TORQUE LIMITING ELECTRIC
SCREW DRIVER IS BEST FOR THIS PORTION OF THE INSTALLATION TO AVOID
OVER-TORQUING DAMAGE USE OF MORE THAN 15 IN.LB TORQUE MAY DAMAGE
FASTENER.
UN TOURNEVIS CRUCIFORME OU UN TOURNEVISE ELECTRIC AVEC UN LIMITEUR
DE COUPLE EST PRÉFÉRABLE POUR CETTE PARTIE DE L'INSTALLATION POUR ÉVITE
UN SERRAGE EXCESSIF. PLUS QUE 15 IN.LB DE COUPLE PEUT ENDOMMAGER LA
VISE
7510 Montevideo Road
© 2014 Tate Access Floors, Inc.
Jessup, MD 20794
Tel (410)799-4200
12 of 26

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SmartAire MZ and is the answer not in the manual?

Subscribe to Our Youtube Channel

Related Products for Tate SmartAire MZ

Table of Contents