STEP 9B: INSTALLATION WITH DIRECTAIRE®
Place the steel stringer hangers into the roll form stringer bases to the left and right parallel stringers to the
face of the rack.
Safely lower the fully extended SmartAire onto the stringer hangers, you may need to slightly tilt the hangers
inward to connect it perfectly.
Lastly, Install the DirectAire Panel gently into the floor. The DirectAire should rest just above the SmartAire
and not apply any force to the SmartAire. If this is not the case please contact Tate for assistance, you may
have non-standard understructure.
7510 Montevideo Road
© 2014 Tate Access Floors, Inc.
Jessup, MD 20794
Tel (410)799-4200
14 of 26

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SmartAire MZ and is the answer not in the manual?

Table of Contents