3-13 Grid Voltage Measurement
Measure AC voltage of the utility at the distribution panel and AC junction box using a voltmeter. Fill
out the below table. If the measured voltage is out of the range which is specified in each table, ask a local
electricity provider about voltage instability.
An array of AC modules
At distribution panel
Single Phase 240V(RMS)
Measure point
Expected
L1 – N
120
L2 – N
120
L3 – N
-
L1 – L2
240
L2 – L3
-
L3 – L1
-
At AC junction box
Single Phase 240V(RMS)
Measure point
Expected
L1 – N
120
L2 – N
120
L3 – N
-
L1 – L2
240
L2 – L3
-
L3 – L1
-
•
Plan the installation work in moderate weather. There is a risk of electric shock when it is snowing or raining.
•
To prevent the risk of accidents, use proper PPE (Personal Protective Equipment) including helmets, eye
protection and gloves at all times.
•
If installation location is high above ground, make sure to use Fall Protection System during
installation.
•
For safety, only qualified personnel should perform the services.
Rev. 1.0
AC Module System Installation Manual
Leave the transition
cable disconnected
AC junction box
Range
Measured
Expected
106~132
120
106~132
120
211~264
208
Range
Measured
Expected
106~132
120
106~132
120
211~264
208
Copyright © 2020 LG Electronics.
All Rights Reserved.
Voltage
measure
Single Phase 208V(RMS)
Range
Measured
106~132
106~132
-
183~229
Single Phase 208V(RMS)
Range
Measured
106~132
106~132
-
183~229
Meter
G
N L1 L2
Distribution pan
el
Three Phase 208V(RMS) Merge,
Split Type
Expected
Range
Measured
120
106~132
120
106~132
120
106~132
208
183~229
208
183~229
208
183~229
Three Phase 208V(RMS) Merge,
Split Type
Expected
Range
Measured
120
106~132
120
106~132
120
106~132
208
183~229
208
183~229
208
183~229
45