loading

Summary of Contents for LG SHH-G1 Series

  • Page 1 SHH-G1-050-GL | SHH-G1-060-GL LG Energy Solution strongly advises users to exercise due care in following LG Energy Solution’s product installation manual. Warranty claims are invalid if damage is caused by human error in a manner inconsistent with the installation manual’s instructions.
  • Page 2: Safety Precautions

    1. Safety Precautions string to the ground exceeds 19.33kΩ to avoid shock hazards. General Disclaimer 6. Keep the battery off, and the inverter disconnects with PV panels and other AC power before connecting • The information in this quick installation guide is subject the battery and the inverter.
  • Page 3 Indicator Status Explanation Potential risks exist. Wear proper PPE before any operations. ON = System is ready BLINK = System is starting up SYSTEM High-temperature hazard. Do not touch SYSTEM SYSTEM SYSTEM OFF = System is not operating the product under operation to avoid BACK-UP ON = Back-up is ready / power being burnt.
  • Page 4: Product Introduction

    2. Product Introduction Dimension 192 mm 182 mm 415 mm Parts 175 mm ① ② ③ ④ ⑤ ⑥ 106 mm ⑦ ⑧ ⑨ ⑩ ⑪ 140 mm 3. Inverter Installation ⑫ ⑬ ⑭ ⑮ Part PV Input Terminal (PV+/PV-) Battery Terminal (BAT+/-) BMS Communication Port Communication Module Port (WiFi or LAN)
  • Page 5 Space Requirements Installing the Inverter 19.69in 7.87in 7.87in 11.81in 11.81in Angle Requirements 1.2~2N·m...
  • Page 6: Electrical Connection

    10-15m m • SHH-G1-050-GL: 5-6mm² Copper , S • SHH-G1-060-GL: 8-10mm² 4. Electrical Connection PE Cable L=L1+(1~2)mm Copper , S • SHH-G1-050-GL: 5-6mm² • SHH-G1-060-GL: 8-10mm² 0.8N·m 1.5~2N·m DC Cable (PV and BAT) AC Cable (ON-GRID&BACKUP) Click 12-14m m 10-15m m •...
  • Page 7 Staubli MC4 (PV) Vaconn (BAT) 7~8mm 7~8mm 7~8mm 7~8mm ≤ S ≤ 4mm 12mm ≤ S ≤ 13mm Click Click Click Click...
  • Page 8: Communication Connection

    5. Communication Connection DRED, Remote Shutdown, RS485 BMS or Smart Meter Color Smart Meter Orange & White 485_A2 Orange Green & White 485_B1 485_B2 Blue CAN_H Blue & White CAN_L 6~8mm Green 485_A1 Brown & White 485_B1 Brown 485_A1 25mm 1.White &...
  • Page 9: Power On And Off

    Communication Module WiFi Kit, LAN Kit, GPRS, Wi-Fi/LAN Kit module: optional 6. Power On and Off � � � Grid Power Meter � AC Breaker ..� To Smart Meter � � Battery Back-Up On-Grid Load Loads Power On Power Off �...
  • Page 10: Commissioning And Monitoring

    7. Commissioning and Monitoring Commissioning via LGES PV Master APP play LGES PV Master App Store <10m <5m LGES PV Master App Monitoring via LG RESU HOME App play LG RESU HOME App Store LG RESU HOME App...
  • Page 12 Keep this manual for later use © 2023 LG Energy Solution ESS Battery Division PARC1, 108, Yeoui-daero, Yeongdeungpo-gu, Seoul, Republic of Korea, 07335 https://www.lghomebattery.com http://www.lgensol.com 340-00938-00...

This manual is also suitable for:

Shh-g1-050-glShh-g1-060-gl

Table of Contents