Figure 9: ZKT03 Thru T05 Unit Side Duct Openings
Table 5: ZKT03 Thru T05 Utilities Entry
Hole
Opening Size (Dia.)
A
7/8" KO
B
2" KO
C
1-5/8" KO
D
1-1/2" KO
1. Opening in the bottom to the unit can be located by the slice in the
insulation.
2. Do not remove the 2" knockout ring.
Figure 10: ZKT03 Thru T05 Roof Curb
Johnson Controls Unitary Products
Used For
1
Control Wiring
1
Power Wiring
Gas Piping (Front)
Gas Piping (Bottom)
Side
2
Bottom
Side
Bottom